2010年PMP美國項目管理考試習題及答案五十三
QUEST Using the situation stated in the Special window, WBS Element Q is _____ budget by _____ percent.
A Over, 16.66
B Under, 16.66
C Over, 10.0
D Under, 10.0
E None of the above.
參考答案:A
QUEST Using the situation stated in the Special window, the schedule performance index (SPI) for WBS Element P is:
A 1.1
B 0.9
C 0.956
D 1.15
E 0.869
參考答案:A
QUEST Using the situation stated in the Special window, the cost performance index (CPI) for WBS Element R is:
A 0.875
B 1.14
C 0.952
D 0.833
E 1.2
參考答案:B
QUEST Using the situation stated in the Special window, which WBS element has a favorable cost variance of $150?
A Element P
B Element Q
C Element R
D Element S
E None of the above.
參考答案:C
QUEST Using the situation stated in the Special window, which WBS element is behind schedule but under budget?
A Element P
B Element Q
C Element R
D Element S
E None of the above.
參考答案:D
相關試題:
2010年PMP美國項目管理考試習題及答案五十二
試題推薦:
2010年PMP美國項目管理認定考試全真模擬試題精選1
2010年PMP美國項目管理認定考試全真模擬試題精選2
2010年PMP美國項目管理認定考試全真模擬試題精選3
- 12013年二級建造師《建筑》:項目施工員
- 2一級注冊消防工程師消防安全技術綜合基礎知識模擬題單選(191)
- 3浙江441個項目向民資開放
- 4建筑工程檢測試驗技術管理規(guī)范術語
- 5混凝土輸送泵打混凝土吃力是什么原因?
- 62015年注冊安全工程師《相關法律知識》練習題(41)
- 7[湖北]隧道施工組織設計
- 8安徽鳳陽簡陋辦公樓獲贊 被曝已建豪華新樓
- 9安全工程師答疑精華:損失控制
- 10園林景觀工程全過程管理手冊
- 11鐵水貯運和預處理設施安全規(guī)定
- 12企業(yè)投資項目核準的條件
- 13基坑圍護結(jié)構(gòu)選型的依據(jù)是什么?
- 14信陽2015安全工程師考試報名時間:2015年4月20日—4月27日
- 152015造價員《安裝工程》知識點:裝飾
- 16中國第三大水電站向家壩電站投產(chǎn)發(fā)電
- 172015年咨詢工程師每日一練免費在線測試(2015.5.4)
- 182015年監(jiān)理工程師《合同管理》選擇第15-21題
- 1908監(jiān)理工程師《投資控制》練習題2
- 202013年二級建造師《施工管理》每日一練(4.15)
- 212015年招標師采購專業(yè)實務全真模擬題2
- 22二級建造師法規(guī)知識點:承擔違約責任的種類
- 23安全工程師考試《管理知識》資料:改進措施
- 24關于做好2007年安全工程師報名考試有關工作的通知
- 25提高產(chǎn)品價值的途徑
- 26張家口2015年造價工程師考試報名時間確定:5月20日至6月17日
- 272015年標師考試項目管理與采購考前模擬題五
- 28公園景觀施工組織設計25p
- 292015年招標師《專業(yè)實務》輔導:招標過程其他民事爭議
- 30銅陵市公布2015年度注冊安全工程師執(zhí)業(yè)資格考試考務工作的通知
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓