1. Management styles associated with production environments, such asassembly lines commonly include:
A. a directing style of leadership.
B. a lack of confidence in their workers
C. assumption that workers lack ambition and dislike responsibility
D. a Theory X style of leadership
E. All of the above.
ANS: E
2. Quality management:
A. is another name for careful inspections.
B. is inversely related to productivity.
C. is primarily the responsiblity of management.
D. is primarily the responsibility of the workers.
E. is essentially a motivational technique.
ANS: C
3. Risk management allows the project manager and the project team
to:
A. eliminate most risks during the planning phase of the project
B. identify project risks
C. identify impacts of various risks
D. plan suitable responses
E. B, C and D only
ANS: E
4. Scheduling is the process by which decisions are made concerning:
A. Tasks to be accomplished.
B. Personnel/organization that will be assigned to accomplish the
task.
C. Time when the tasks are to be completed.
D. All of the above.
E. A and C only.
ANS: E
5. The basic elements of communication include:
A. Listening, talking and sign language.
B. Communicator, encoding, message, medium, decoding, receiver, and
feedback
C. Clarity of speech and good listening habits
D. Reading, writing and listening
E. All of the above
ANS: B
6. Which of the following would most likely increase the accuracy of
estimating the project cost?
A. Pricing out the work at lower levels in the work breakdown
structure.
B. Using historical data.
C. Talking to people who have worked on similar projects.
D. All of the above.
E. A and C only.
ANS: D
7. A variance envelope has been established on a project. The
envelope goes from +-30% in R&D to +-5% during manufacturing. The
reason for
the change in thickness of the envelope is because:
A. The management reserve has been used up.
B. The accuracy of the estimates in manufacturing are worse than the
estimates in R & D.
C. Tighter controls are always needed as a project begins to wind
down.
D. Of the personal desires of the project sponsor.
E. Of none of the above
ANS: E
8. Cost of quality is:
A. associated with non-conformance to specifications and
requirements.
B. primarily caused by poor workmanship of workers who are building
or manufacturing the product.
C. used to determine whether a quality management program is suitable
for a given project.
D. negligible for most large projects.
E. A and B
ANS: A
9. Management plans include all of the following except:
A. Organization of project.
B. Job descriptions.
C. Policies and procedures.
D. Linear responsibility charts.
E. Scope baseline.
ANS: E
10. The Japanese resource management model exhibits:
A. a cooperative spirit of goal setting.
B. non-specialized career paths
C. frequent changes in team assignments
D. a Theory Z style of management
E. All of the above.
ANS: E
- 1最大核電規(guī)劃項(xiàng)目開工 核電重啟
- 2路塹客土噴播植草施工方案23p
- 3招標(biāo)師職業(yè)水平考試:項(xiàng)目管理與招標(biāo)采購第二章練習(xí)題33
- 4安全工程師生產(chǎn)管理復(fù)習(xí)要點(diǎn):徑集數(shù)
- 52015年咨詢工程師《決策分析與評(píng)價(jià)》模擬題(15)
- 6未列入合同文件的地質(zhì)資料使用問題
- 72015年貴州安全工程師考試報(bào)名時(shí)間為6月1日-6月21日
- 8某駁岸圍堰專項(xiàng)施工方案
- 9江西省關(guān)于2015年度造價(jià)師網(wǎng)絡(luò)教育收款收據(jù)換取發(fā)票的通知
- 10《項(xiàng)目管理與招標(biāo)采購》輔導(dǎo):項(xiàng)目進(jìn)度管理體系
- 11安全工程師案例分析復(fù)習(xí)要點(diǎn):火災(zāi)
- 12建設(shè)工程施工全過程安全監(jiān)理
- 13灌注水下混凝土?xí)r鋼筋籠上升的預(yù)防及處理
- 142015年一級(jí)建造師《通信與廣電》知識(shí)摘要(11)
- 152015年造價(jià)工程師《理論與法規(guī)》課程講義(5)
- 16引水隧洞施工組織設(shè)計(jì)84p
- 17金沙江魯某水電站保通隧道工程施工組織設(shè)計(jì)
- 182015年寧夏注冊(cè)安全工程師報(bào)名入口
- 192015招標(biāo)師成績(jī):法規(guī)81、管理85、實(shí)務(wù)76、案例74
- 202015年齊齊哈爾造價(jià)工程師現(xiàn)場(chǎng)審核地點(diǎn)及時(shí)間
- 21小型混凝土攪拌車驅(qū)動(dòng)裝置的維護(hù)工作
- 222015安全工程師《生產(chǎn)管理知識(shí)》試題精選(2)
- 232015年咨詢工程師《宏觀經(jīng)濟(jì)政策》練習(xí)題(50)
- 242015年一級(jí)建造師考試《法規(guī)及相關(guān)知識(shí)》沖刺習(xí)題(13)
- 25某公園水景工程施工組織設(shè)計(jì)
- 262015造價(jià)員《土建工程》知識(shí)點(diǎn):防水涂料
- 272015年安全工程師考試《安全生產(chǎn)法及相關(guān)》輔導(dǎo)資料(25)
- 282012一級(jí)建造師《機(jī)電工程》焊接材料的分類
- 29普通碳素結(jié)構(gòu)鋼進(jìn)場(chǎng)外觀檢查的內(nèi)容是什么
- 30招標(biāo)師考試:項(xiàng)目融資風(fēng)險(xiǎn)管理
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓