監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價(jià)咨詢管理系統(tǒng) | 工程設(shè)計(jì)管理系統(tǒng) | 甲方項(xiàng)目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關(guān)閉
軟件項(xiàng)目管理工具

當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具

PMP認(rèn)證考試練習(xí)題(七)(中英文)

申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114

1. The project manager can enhance project communication and team building by doing all the following except—
Having a war room
Using a tight matrix
Being a good communication blocker
Being a communication expeditor
Holding effective meetings

項(xiàng)目經(jīng)理不可以通過實(shí)施以下方法加強(qiáng)項(xiàng)目溝通及團(tuán)隊(duì)建設(shè):
設(shè)立作戰(zhàn)間
運(yùn)用緊密矩陣
做一個(gè)好的溝通阻斷劑
做交流的使者
召開高效會(huì)議

2. Of the following factors, which one has the greatest effect on the project’s communication requirements?
Stakeholder responsibility relationships
External information needs
Availability of technology
The project’s organizational structure
Expected project staffing

以下因素中,哪一個(gè)對(duì)項(xiàng)目溝通需求有最大的影響?
利害關(guān)系者職責(zé)關(guān)系
外部信息需求
技術(shù)的可用性
項(xiàng)目組織結(jié)構(gòu)
期望的項(xiàng)目人員招募

3. Paraphrasing can be achieved by restatement—
In different terms
From general to specific terms
From specific to general terms
In opposite terms
All the above

可通過重述___達(dá)到解釋的目的
不同的條款
從普遍到特殊項(xiàng)目
從特殊到普遍項(xiàng)目
相反的條款
以上全部

4. The most common communication problem that occurs during negotiation is that—
Each side may misinterpret what the other side has said
Each side may give up on the other side
One side may try to confuse the other side
One side may be too busy thinking about what to say next to hear what is being said
Either side may not be paying attention

談判過程中最普遍發(fā)生的溝通問題是:
方可能對(duì)對(duì)方有曲解
雙方可能在其他方面讓步
一方可能企圖迷惑另一方
一方可能忙于思考要說的話而未聽到剛才對(duì)方所說的話
雙方均未注意

5. Which or the following is true regarding communication within a project environment?
The project manager must assume the primary burden or responsibility to ensure that messages sent have been received.
Effective meetings, a war room, and a tight matrix promote effective communication.
If a project consists of 12 people, 48 potential channels of communication exist.
Most project managers spend 30 percent of their working hours engaged in communication.
All the above

在項(xiàng)目環(huán)境中以下哪個(gè)關(guān)于交流的陳述是正確的?
項(xiàng)目經(jīng)理必須假定主要的擔(dān)子和責(zé)任以確保傳達(dá)的信息被接收.
有效的會(huì)議,作戰(zhàn)室及緊密矩陣結(jié)構(gòu)可以促進(jìn)有效的溝通.
項(xiàng)目中有12個(gè)人,48條潛在的溝通渠道.
大多數(shù)項(xiàng)目經(jīng)理花費(fèi)30%的工作時(shí)間用于溝通.
以上全部

6. Performance reports are used to provide information to stakeholders on Project scope, schedule, cost, and quality. Which statement most accurately describes this process?
a. The configuration control board receives performance reports and generates change reports to modify aspects of the project.
b. Performance reporting includes status reports, which detail where the Project is now; progress reports, which describe accomplishments; and forecasts, which predict future status and progress.
Performance reporting focuses on examining earned value analysis to determine whether cost overruns will require budget revisions.
Performance reporting includes histograms, flow charts, and bar charts to show network dependencies and relationships.
Performance reporting provides variance analysis information, which helps the project team adhere to the zero variance principle.

執(zhí)行情況報(bào)告被用于向利益相關(guān)者提供項(xiàng)目范圍、進(jìn)度、成本和質(zhì)量方面的信息. 以下那種陳述最精確的描述了這一過程?
a. 配置控制委員會(huì)接到執(zhí)行情況報(bào)告并生成變更報(bào)告以修改項(xiàng)目的相關(guān)方面.
b. 執(zhí)行情況報(bào)告包括狀態(tài)報(bào)告(詳細(xì)描述工程狀況),進(jìn)展報(bào)告(描述完成情況),和預(yù)算(預(yù)測(cè)未來狀況和進(jìn)度)
執(zhí)行情況報(bào)告著重于調(diào)查掙得值分析以確定是否超支并需要更改所需預(yù)算
執(zhí)行情況報(bào)告包括柱狀圖,流程圖,線性圖以演示網(wǎng)絡(luò)的叢屬及相互關(guān)系
執(zhí)行情況報(bào)告提供偏差分析信息,從而有助于項(xiàng)目組遵循零偏差原則

7. The project manager who adopts the shareholder manager leadership style---
Solicits little or no information from his or her team and makes decisions alone
Solicits input from the team and makes decisions alone
Invites team members to share in project decision deliberations
Delegates decision making to the team without much information exchange
Lets the project team assume as much leadership responsibility as it will accept

采用股東經(jīng)理領(lǐng)導(dǎo)風(fēng)格的項(xiàng)目經(jīng)理________
極少或根本不從他或她的小組中征求意見就自己做決策
從項(xiàng)目組取得信息然后自己做決策
邀請(qǐng)項(xiàng)目組成員參與項(xiàng)目決策的商議
無太多的信息交流將決策權(quán)委派給項(xiàng)目組
讓項(xiàng)目組采取其可接受的盡可能大的領(lǐng)導(dǎo)職責(zé)

發(fā)布:2007-03-02 10:48    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件