1 The project manager that allows and supports group discussions and decision making is called a(n) _____ manager.
A autocratic
B consultant autocratic
C consensus
D shareholder
E None of the above.
ans:C
2 Power games, withholding information, and hidden agendas are examples of-.
A noise
B communication barriers
C indirect communication
D mixed messages
E All of the above
ans:B
3 The main player in project communication is the
A sponsor
B project manager
C functional manager
D functional team
E All of the above.
ans:B
4 A recurring communication pattern within the project organization or company is called a:
A free-form matrix
B structured matrix
C network 來源:www.examda.com
D rigid channel
E None of the above.
ans:C
5 An informal communication network on a project and within an organization is called a(n):
A free upward flow
B free horizontal flow
C unrestricted communication flow
D grapevine
E open network
ans:D
6 Your sponsor announce to you and your team that his/her door is open to everyone wishing to discuss project problems. Yet, the sponsor seems to be annoyed whenever someone does stop by, even when discussing a serious problems. This is an example of.
A semantics
B credibility
C inconsistent signals
D perceptual differences
E misunderstood role
ans:C
7 Managers who adopt a sound, but prudent managerial style are called
A authorization
B conciliatory
C ethical 來源:考試大網(wǎng)
D judicial
E promotional
ans:D
8 Sound, prudent, but often unsophisticated judgement is called:
A common sense
B rational management
C smoothing
D confrontation
E None of the above
ans:A
9 Which of the following is least likely to be used in explaining to a team member why you consider his/her performance substandard?
A Project office memo
B counseling session
C project team meeting
D formal letter
E individual conversation
ans:C
10 For every situation, several methods usually exist for effective communication to take place. Which of the following is least likely to be used for explaining to the team project planning guidelines?
A project office memo
B project office directive
C project team meeting
D formal report
E counseling sessions
ans:D
11 A project team member submits a suggestion on how to improve the corporate procurement process. This is an example of _____ communication
A upward
B downward
C horizontal
D diagonal
E None of the above.
ans:A
12 Job descriptions are examples of ______communications.
A upward
B downward
C horizontal
D diagonal
E None of the above
ans:E
- 1鐵水貯運和預(yù)處理設(shè)施安全規(guī)定
- 2安全工程師考試《法律法規(guī)》習(xí)題班第八講講義(13)
- 32015年和田造價工程師報名繳費時間及費用
- 4安全工程師《法律法規(guī)》知識要點:安全生產(chǎn)標(biāo)準(zhǔn)種類1
- 5河南省2008年造價工程師報名時間/報名地點/報名條件討論區(qū)
- 6建筑施工階段沉降觀測怎么做?
- 72015招標(biāo)師考試項目管理考點:項目進度管理體系
- 860平臺灣老屋改造“雜志”北歐家居設(shè)計
- 92015監(jiān)理工程師《基礎(chǔ)理論與相關(guān)法規(guī)》強化訓(xùn)練(十)
- 102015年咨詢工程師考試《工程項目組織管理》模擬題(45)
- 112012一級建造師《公路工程》:橋梁上部結(jié)構(gòu)支架施工方法
- 12工程項目組織與管理知識點:過程控制管理
- 132015年安全工程師《安全生產(chǎn)法及相關(guān)法律知識》每日一練(4.20)
- 14洛杉磯“全混凝土粗獷風(fēng)”Line酒店 粗獷精致并存
- 15一級建造師管理與實務(wù)復(fù)習(xí)要點:暗標(biāo)
- 16基于逆向工程的轉(zhuǎn)子發(fā)動機關(guān)鍵件設(shè)計
- 17國家發(fā)改委關(guān)于注冊安全工程師收費標(biāo)準(zhǔn)的通知(考試介紹)
- 182015年咨詢工程師《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》每日一練3.3
- 19一級建造師工程經(jīng)濟復(fù)習(xí)要點:等額償還
- 202015年造價工程師《計價控制》第二章講義(10)
- 21園區(qū)廣場工程施工組織設(shè)計62p
- 222015年安全工程師《生產(chǎn)技術(shù)》:水運交通危險有害因素
- 232015年安全工程師《管理知識》:生產(chǎn)性粉塵作業(yè)分級
- 24安全工程師生產(chǎn)技術(shù)復(fù)習(xí)要點:電阻
- 252015年咨詢工程師《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》每日一練7.21
- 262015年招標(biāo)師考試學(xué)習(xí)資料:工程建設(shè)項目的投融資管理
- 27韶關(guān)市2015年安全工程師考試報名時間為4月13日至5月14日
- 28武漢豪宅業(yè)主深挖車庫 改建三室三廳地下居室
- 292015年咨詢工程師《組織與管理》每日一練(6.18)
- 30高層框架結(jié)構(gòu)辦公樓防水工程施工方案
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓