2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案七十五

申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114

QUEST Which of the following is based on an individual identification with a more powerful person. 
A expert power 
B reward power 
C referent power 
D A and B. 
E A and C 
參考答案:C

QUEST Which of the following results are Win/Win conflict resolution? 
A compromising 
B forcing 
C problem solving 
D smoothly 
E withdraw 
參考答案:C

QUEST Which of the following organizations has the best technical project control? 
A matrix 
B functional 
C projectized 
D B and C 
E A and B 
參考答案:D

QUEST The functional organization is effective with a mature product or single product line. 
A TRUE 
B FALSE 
C參考答案:
D參考答案:
E參考答案:
參考答案:A

QUEST The strong matrix versus a weak matrix. 
A team members are more likely to be assigned to the project office in a strong matrix 
B strong matrix is more difficult to manage. 
C the balance of power has shifted away from the PM. 
D functional managers no longer has control over the technical processes. 
E All of the above. 
參考答案:A

相關(guān)試題:

2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案七十四

試題推薦:

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:54    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件