2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案二十六

申請(qǐng)免費(fèi)試用、咨詢(xún)電話:400-8352-114

QUEST In crashing a task, you would focus on: 
A As many tasks as possible. 
B Non critical tasks. 
C Accelerating performance of tasks on critical path. 
D Accelerate performance by minimizing cost. 
E A and D. 
參考答案:C

QUEST Using the problem stated in the Special window, Calculate the expected value of duration (in days) using the PERT concept of the expected duration of a task 
A 8 
B 8.8 
C 9.1 
D 9.7 
E 10.5 
參考答案:B

QUEST Using the WBS in the Special window,  an instance of a work package is: 
A Build house 
B Excavate 
C Prepare Foundation 
D B and C 
E None of the above 
參考答案:E

QUEST All of the following are categories of a milestone in a schedule except: 
A End date. 
B Contract dates. 
C Key events scheduled. 
D Imposed dates. 
E Task duration. 
參考答案:E

QUEST The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project. 
A Increases. 
B Is not affected by 
C Does not require 
D Is heavily dependent upon 
E Is the only means of determining 
參考答案:D

相關(guān)試題:

2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案二十五

試題推薦:

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:54    編輯:泛普軟件 · xiaona    [打印此頁(yè)]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件