Qustions 1:
According to McGregor, a manager who uses Theory X sees workers as--
a.
Highly motivated,willing to take responsibility, and reliable
b. Highly untrustworthy, needing to be watched and closely managed at all times
c. Very productive when first given an assignment
d. Unproductive at first, followed by periods of high productivity
Qustions 3:
A Project management information system comprises--
a.
IAny of the project management software used for schedule development
b. All the requited reports to be prepared on the project, who receives each one, and the method of distribution
c. The policies and procedures to follow as the project is performed
d. The tools and techniques used to gather, integrate, and disseminate the output of the other project management processes
Qustions 5:
The Project plan should be distributed to--
a. All stakeholders in the performing organization
b. All project stakeholders
c. Project team members and the project sponsor
d. Those people defined in the communication management plan
Qustions 2:
Although an output of the various control processes, corrective action is also an input to project plan execution because it--
a. Ensures that project objectives are met
b. Expedites actions to ensure that activities are completed on time
c. Completes the feedback loop needed to ensure effective project management
d. Involves performing a planned reponse for a specific project risk event
Qustions 4:
A change control board is --
a. Recommended for use on all projects, large or small
b. Used as required to approve or reject change requests
c. Managed by the project manager who serves its secretare
d. Composed of key members of the project team
Qustions 6:
Leadership and management are both necessary on projects. One definition of managing is that it involves producing key results expected by stakeholders, whereas leadership involves --
a. Establishing direction, aligning people, and motivating and inspiring others
b. Getting things done through other people
c. Using charismatic power to motivate others to be productive
d. Using all types of power, as appropriate, as motivational tools
- 1高支模架結(jié)構(gòu)安全策略思考及設(shè)計(jì)方法
- 2陜西:府谷縣加快推進(jìn)城鎮(zhèn)化進(jìn)程 城鎮(zhèn)化率達(dá)到62.5%
- 3水泥攪拌車(chē)把寶馬壓成餅 車(chē)內(nèi)姐妹當(dāng)場(chǎng)身亡
- 4一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):后背
- 52015年監(jiān)理工程師《建設(shè)工程三大控制》練習(xí)題(147)
- 6石家莊最牛違建:10層樓頂加蓋2層仿古建筑
- 7南水北調(diào)工程開(kāi)工十年 社會(huì)經(jīng)濟(jì)生態(tài)效益漸顯
- 8編制標(biāo)書(shū)常見(jiàn)的錯(cuò)誤(二)
- 92015年監(jiān)理工程師考試質(zhì)量、投資、進(jìn)度控制練習(xí)題(50)
- 102015年監(jiān)理工程師考試質(zhì)量、投資、進(jìn)度控制練習(xí)題(37)
- 11城市熱力管道焊接的施工要求
- 12污水管工程拖管法施工組織設(shè)計(jì)
- 132013年廣西二級(jí)建造師變更注冊(cè)申請(qǐng)表
- 14福建某醫(yī)院病房綜合樓屋面防水施工方案
- 152015年咨詢(xún)工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(8.19)
- 16項(xiàng)目管理軟件都有哪些???
- 172015年安全工程師《生產(chǎn)管理知識(shí)》試題精選(15)
- 18總投資收益率是指項(xiàng)目達(dá)到設(shè)計(jì)能力后正常年份的什么與項(xiàng)目總投資的比率
- 19市政排水施工組織設(shè)計(jì)47P
- 20一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):頂推
- 212015年一級(jí)建造師輔導(dǎo)資料:機(jī)電工程項(xiàng)目分包合同范圍
- 222015年咨詢(xún)工程師《政策與規(guī)劃》每日一練(2.15)
- 23工程造價(jià)基礎(chǔ)知識(shí)建設(shè)項(xiàng)目投資估算:資金籌措
- 24某大橋大直徑鉆孔樁特殊施工工法
- 25工程造價(jià)從業(yè)人員工作內(nèi)容
- 262015招標(biāo)師法規(guī)與政策考前知識(shí)點(diǎn):對(duì)投標(biāo)人參與投標(biāo)限制
- 27基坑支護(hù)、挖土單位怎么互相配合
- 282012一級(jí)建造師《公路工程》:材料人員的成本管理責(zé)任
- 29土體分層沉降監(jiān)測(cè)有哪些注意事項(xiàng)?
- 30基坑按工作機(jī)理和圍護(hù)墻形式分為哪幾類(lèi)形式?
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓