長螺旋CFG-20; 長螺旋CFG-23 長螺旋CFG-26 長螺旋CFG-30
成孔直徑/mm:400-800; 成孔直徑/mm:400-800 成孔直徑/mm:400-800 成孔直徑/mm:400-800
動力頭功率/kw:45*2; 動力頭功率/kw:45*2; 動力頭功率/kw:55*2; 動力頭功率/kw:55*2;
成樁深度/m:20; 成樁深度/m:23 成樁深度/m:26 成樁深度/m:30
最大提拔力/kN:240; 最大提拔力/kN:400; 最大提拔力/kN:400; 最大提拔力/kN:400;
主機轉速r/min:21; 主機轉速r/min:21; 主機轉速r/min:21; 主機轉速r/min:16;
輸出扭距/kN.m:39; 輸出扭距/kN.m:39; 輸出扭距/kN.m:48.5; 輸出扭距/kN.m:63.7;
行走步距/mm:1500; 行走步距/mm:1500; 行走步距/mm:1500; 行走步距/mm:1800;供應雄飛CFG柴油錘樁架|長螺旋鉆機圖片|長螺旋樁機報價|樁工機械廠家
回轉角度:90; 回轉角度:90; 回轉角度:90; 回轉角度:90;供應雄飛CFG柴油錘樁架|長螺旋鉆機圖片|長螺旋樁機報價|樁工機械廠家
樁機質(zhì)量/T:40; 樁機質(zhì)量/T:42; 樁機質(zhì)量/T:50; 樁機質(zhì)量/T:62;CFG樁 示意圖CFG樁是英文Cement Fly-ash Gravel的縮寫,意為水泥粉煤灰碎石樁,由碎石、石屑、砂、粉煤灰摻水泥加水拌和,用各種成樁機械制成的可變強度樁。通過調(diào)整水泥摻量及配比,其強度等級在C5-C25之間變化,是介于剛性樁與柔性樁之間的一種樁型。CFG樁和樁間土一起,通過褥墊層形成CFG樁復合地基共同工作,故可根據(jù)復合地基性狀和計算進行工程設計。CFG樁一般不用計算配筋,并且還可利用工業(yè)廢料粉煤灰和石屑作摻和料,進一步降低了工程造價。
產(chǎn)品特點:
1、樁機底盤高,鉆出來的泥土在底盤下面,因此移位方便,就位準確。
2、前支腿窄后支腿寬,斜支撐形成倒三角型,回轉時前支腿影響面積小,基坑邊角容易鉆樁。
3、整機重量大、過載能力強、保險系數(shù)高,工作時穩(wěn)定可靠。
4、整機就位一次,同時可打兩排4—6根樁,效率可提高百分之三十。
5、鉆桿結構合理,材質(zhì)好葉片厚,互換性強,同心度高。
6、采用多功能樁架,可掛其它動力施工,一機多用。
7、行走輪在履靴鋼軌上行走,堅固耐用。
8、樁機底盤整體拖運,免除現(xiàn)場拆裝連接過程。
9、有多種型式的鉆頭,可對付多種復雜地層施工。
10、滑板均裝有尼龍?zhí)缀湍猃埌蹇鼓p,并保護滑道。
11、先進的液壓步履式行走方式較長的行走步距,滿足惡劣場地內(nèi)的施工。
12、除此之外CFG23米(含23米)以下樁機;整個臂架及支腿全部折疊于機架上,運輸時整體拖運。進入現(xiàn)場靠液壓操縱,起落臂架方便快捷省時省力。主機滑輪已經(jīng)繞好鋼絲繩,組裝時與動力頭由一要銷軸穿上便可開鉆
聯(lián)系電話:18733967899 全國免費電話:400-6802-686
The national free telephone advice: 400-6802-686 18733967899
Long spiral CFG-20; long spiral CFG-23 long spiral CFG-26 long spiral CFG-30
A hole diameter / mm : 400-800; a hole diameter / mm: 400-800 / mm: 400-800 into a hole diameter hole diameter / mm: 400-800
Head power / kW: 45 * 2; head power / kW: 45 * 2; head power / kW: 55 * 2; head power / kW: 55 * 2;
Pile depth / M: 20; pile depth / M: 23 pile depth / M: 26 / M: 30 pile depth
Maximum promoted force / kN: 240; maximum promoted force / kN: 400; maximum promoted force / kN: 400; maximum promoted force / kN: 400;
The engine speed r / min: 21; the engine speed r / min: 21; the engine speed r / min: 21; the engine speed r / min: 16;
Output torque / kN.m: 39; output torque / kN.m: 39; output torque / kN.m: 48.5; output torque / kN.m: 63.7;
Walking distance of step / mm: 1500; walking pace / mm: 1500; walking pace / mm: 1500; walking pace / mm: 1800;
Rotary angle: 90 ; rotary angle: 90 ; rotary angle: 90 ; rotary angle: 90 ;
Pile machine quality / T: 40; pile machine quality / T: 42; pile machine quality / T: 50; pile machine quality / T: 62; CFG pile diagram CFG pile is the English Cement Fly-ash Gravel is an abbreviation for cement fly ash gravel pile, composed of gravel, stone, sand and fly ash mixed cement mixed with water, using a variety of piling machinery made of variable strength of pile.Through the adjustment of cement content and ratio, the strength grade of C5-C25 changes in between, is between rigid pile and pile between a pile type.CFG pile and soil between piles with cushion layer is formed by CFG pile composite foundation to work together, so it can be based on the behavior of composite foundation and calculation in engineering design.CFG pile is generally not reinforcement calculation, and may also utilize the industrial waste fly ash and crushed stone for admixture, further reducing the project cost.
Product features:供應雄飛CFG柴油錘樁架|長螺旋鉆機圖片|長螺旋樁機報價|樁工機械廠家
1, pile machine chassis, drill out of the dirt below the chassis, so the shift is convenient, accurate positioning.
In 2, the front legs narrow rear legs wide diagonal bracing forming inverted triangle, turning the front leg impact area is small, easy to drill pile foundation pit edge angle.
In 3, the weight of large, strong overload capacity, high safety coefficient, stable and reliable operation.
In 4, the place once, at the same time can play two rows of 4 - 6 piles, efficiency can be increased by thirty percent.
Drill pipe 5, reasonable structure, good material thick leaves, strong interchangeability, high concentricity.
6, the multifunctional pile frame, can hang the other power construction, the use of a machine.
7, walking round in the boot of rail travel, durable.
8, pile machine chassis haulage, free of site disassembly process connection.
9, there are a variety of types of drill bits, can cope with a variety of complex strata construction.
In 10, skate are provided with the nylon sleeves and nylon plate wear, and protect the chute.
11, advanced hydraulic walk longer walking pace, meet bad site construction.
12, in addition to CFG23 meters (including 23 meters) below the pile machine; the arm and leg folded entirely on the machine frame, transportation as a whole haulage.Enter the scene by hydraulic control, the lift arm frame is convenient and time-saving.The host has been around the steel wire rope pulley, assembly and power head by a pin shaft can then be drilled
Tel: 18733967899 national free telephone : 400-6802-686 anxious lady供應雄飛CFG柴油錘樁架|長螺旋鉆機圖片|長螺旋樁機報價|樁工機械廠家