當前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 施工管理軟件
ST3/4"*1/2-30"*28"ASME 同心大小頭異徑管
Butt welded seamless reducer
Size
3/4" * 1/2" -30" * 28" ASME B16.9
Wall thickness
Sch5-Sch160 XXS
Standard
ANSI, ASME API5L, OCT, DIN and JIS, etc.
we can also produce according to drawing and standards provided by customers.
Material
Carbon steel, alloy steel and stainless steel.
We can produce according to materials appointed by consumers.
Packaging
Wooden Cases, wooden pallet plastic bag or as customers requirement
Surface Treatment
Shot blasted, rust-proof black oil
Delivery Time
5-30 days
Quality
First grade
Others
1.Special design available according to your drawing.
2.anti-corrosion and high-temperature resistant with black painting
3. All the production process are made under the ISO9001:2000 strictly.
4. A conformity rate of ex-factory inspection of products.
- 12015年二級建造師市政工程案例分析(9)
- 22015年安全工程師:水運交通危險的有害因素
- 3某高速公路貴州高原段(投標)施工組織設計
- 4監(jiān)理工程師建設工程投資控制復習要點:履約證書
- 514層寫字樓施工組織設計
- 6滄州開發(fā)區(qū)供應914*20標準規(guī)格345b特殊材質(zhì)
- 7杭州梅竺隧道設計
- 8混凝土工程質(zhì)量通病的產(chǎn)生及防治措施
- 9甲級城市規(guī)劃編制單位標準
- 102015年監(jiān)理工程師《理論與法規(guī)》復習指導:組織協(xié)調(diào)的方法(2)
- 11山東省建筑自動消防設施安裝質(zhì)量檢驗評定規(guī)程
- 12高速公路景觀設計探討
- 13Partnering模式的特征
- 14四川某高層商住樓工程魯班獎復查報告
- 15淺談預制箱梁短線臺座法施工技術(shù)
- 16要布鋼絲網(wǎng)嗎
- 17建筑工程圖紙會審記錄內(nèi)容主要包括哪些?
- 18淺析提高建筑工程造價審核質(zhì)量的方法和途徑
- 192015年監(jiān)理工程師考試答疑:關(guān)于驗收結(jié)算時間
- 20臨沂市某市政道路工程(投標)施工組織設計
- 21涂料企業(yè)應改如何積極應對“渠道下沉”
- 22磚混框架結(jié)構(gòu)擴建高價位別墅的施工探討
- 23售樓中心建筑工程質(zhì)量通病防控措施
- 24現(xiàn)代化智能型寫字樓施工組織設計(框架剪力墻結(jié)構(gòu))
- 25某住宅小區(qū)一期工程水暖施工方案
- 26淺談干掛石板幕墻及玻璃幕墻工程的施工
- 272015建設工程質(zhì)量控制要點:分項工程質(zhì)量驗收
- 28JS500混凝土攪拌機雙臥軸強制式
- 29基坑開挖圍護專項施工方案
- 30某項目部各工種安全生產(chǎn)崗位責任制(2009年)
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓