PMP認(rèn)證考試練習(xí)題(十二)(中英文)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. The project plan is a document designed to tell__________ exactly what should be happening in a given
period of time.
Anyone associated with the project
The project manager
The functional manager
The client
項(xiàng)目計(jì)劃是設(shè)計(jì)用于向____確切描述在給定時(shí)段將發(fā)生情況的文件.
任何與項(xiàng)目有關(guān)的人
項(xiàng)目經(jīng)理
職能經(jīng)理
客戶
2. In which process group do we identify human and non-human resources required for a project?
Initiating
Executing
Planning
Controlling
Closing
在哪一個(gè)過(guò)程組中我們可確定項(xiàng)目所需的人力和非人力資源?
立項(xiàng)
實(shí)施
計(jì)劃
控制
收尾
3. Feasibility studies are performed in the ______ process group of the project.
Initiating
Executing
Planning
Controlling
可行性研究在項(xiàng)目的____過(guò)程組實(shí)施?
立項(xiàng)
實(shí)施
計(jì)劃
控制
4. In which process group do we examine alternative ways of accomplishing project objecties?
Initiating
Executing
Closing
Planning
Controlling
我們?cè)谀囊粋€(gè)過(guò)程組調(diào)查實(shí)現(xiàn)項(xiàng)目目標(biāo)的不同途徑?
立項(xiàng)
實(shí)施
收尾
計(jì)劃
控制
5. In which process group do we transfer resources to other systems?
Initiating
Executing
Controlling
Planning
Closing
在哪一個(gè)過(guò)程組我們將資源轉(zhuǎn)移到其他系統(tǒng)?
立項(xiàng)
實(shí)施
控制
計(jì)劃
收尾
6. Your bowling alley business has exploded ever since you introduced a “dating service league. Accordingly, you need to build another facility and have assembled an invitation for bid (IFB) package with all the necessary descriptions of the required supplies, equipment, and services. You are convinced that the IFB. Will result in equal and fair competition among all sellers. You want to avoid any confusion regarding the work to be performed because you probably will not conduct negotiations with the sellers; however, you may or may not award the contract to the lowest-bidding seller, and you have made this clear in the IFB. In this situation, you should be prepared to
a . Prohibit sellers from attending the bid opening because you will need time to decide to whom to award ontract
b. Document your award decision as completely as possible to all sellers
c. Inform the seller who won the bid and indicate to the others that no further discussion will take place on this issue
d. Limit the sellers who will receive the IFB to reduce conflict
自從你引入“年代測(cè)定服務(wù)”聯(lián)盟以來(lái),你的保齡球道業(yè)務(wù)有了很大的發(fā)展. 因此,你需要再建造一套設(shè)施,并已經(jīng)準(zhǔn)備好了一套包括你所需的全部必?垢?⑸璞負(fù)頭?衩枋鱸諛詰耐侗暄?耄↖FB)會(huì)為所有供應(yīng)商提供公平的競(jìng)爭(zhēng)機(jī)會(huì). 你接下來(lái)的工作中你想要避免任何的混亂,因?yàn)槟憧赡懿荒芸刂坪凸?yīng)商的談判. 然而你既可以把這份合同交給報(bào)價(jià)最低的投標(biāo)供應(yīng)商來(lái)做,也可以不交給他們做,這些也都在投票邀請(qǐng)IFB中交待清楚了. 在這種情況下,你應(yīng)該在下列哪個(gè)方面做好準(zhǔn)備.
因?yàn)槟阈枰獣r(shí)間考慮把合同交給哪個(gè)供應(yīng)商做,所以要阻止供應(yīng)商參加公開的投標(biāo)
向所有的供應(yīng)商盡可能全面地說(shuō)明你的合同授予決定
通知贏得合同的供應(yīng)商并向其他供應(yīng)商說(shuō)明在這個(gè)沒(méi)有再進(jìn)一步討論的余地了
向有限的供應(yīng)商發(fā)放IFB以沖突
7. Your team is working on an international project to build a regional cellular network in a small, mountainous country. After 10 days of work, a major political activist is killed in an unfortunate hang gliding accident. His death leads to mass riots throughout the country. Work cannot continue, and your team returns home. A risk such as civil unrest typically requires
Upfront risk management planning with continual review of the plan throughout the project life cycleDisaster recovery actions instead of risk managementPeriodic risk audit and project risk reviews A repository or risk database to be established as the basis of a risk lessons learned program
你的團(tuán)隊(duì)正在一個(gè)多山的小國(guó)家從事一個(gè)地區(qū)性小型網(wǎng)絡(luò)建設(shè)的國(guó)際項(xiàng)目. 在工作了10天之后,一個(gè)主要的政治激進(jìn)分子在一次不幸的懸掛物下滑的意外事故中喪生了. 他的死亡在這個(gè)國(guó)家引發(fā)了全國(guó)性的群眾暴動(dòng). 工作無(wú)法繼續(xù)進(jìn)行下去,你的團(tuán)隊(duì)也回國(guó)了. 像社會(huì)動(dòng)蕩這樣的風(fēng)險(xiǎn)一般要求要在整個(gè)項(xiàng)目生命周期中不斷回顧計(jì)劃的進(jìn)展,以此來(lái)把風(fēng)險(xiǎn)管理計(jì)劃擺在第一位用災(zāi)難補(bǔ)救的行為來(lái)代替風(fēng)險(xiǎn)管理周期性的風(fēng)險(xiǎn)審計(jì)和項(xiàng)目風(fēng)險(xiǎn)評(píng)估建立一個(gè)知識(shí)庫(kù)或風(fēng)險(xiǎn)數(shù)據(jù)庫(kù),以此作為由項(xiàng)目中吸取遭受風(fēng)險(xiǎn)的經(jīng)驗(yàn)教訓(xùn)的基礎(chǔ)
- 12015年咨詢工程師《現(xiàn)代咨詢方法與實(shí)務(wù)》練習(xí)題(16)
- 2【招標(biāo)師考試】項(xiàng)目管理與招標(biāo)采購(gòu)第二章:工程建設(shè)項(xiàng)目合同管理
- 3二級(jí)復(fù)習(xí)資料腳手架常見的設(shè)計(jì)施工問(wèn)題
- 4湖南某住宅主體施工階段平面布置圖
- 52015年土木工程復(fù)習(xí)資料—防水工程
- 62015造價(jià)員《安裝工程》熱力安裝:層鋪式結(jié)構(gòu)爐襯
- 7西藏:2013年交通投資220億 新增公路5000公里
- 8《政策與規(guī)劃》知識(shí)點(diǎn):我國(guó)政府采購(gòu)制度的概念以及基本內(nèi)容
- 9造價(jià)員考試睡眠減壓法
- 102015年造價(jià)員基礎(chǔ)知識(shí):鋼筋驗(yàn)收
- 11決策與分析考點(diǎn):土建工程方法設(shè)計(jì)
- 12小型混凝土攪拌車的維護(hù)注意事項(xiàng)
- 132015年咨詢工程師《工程咨詢概論》每日一練9.22
- 142015造價(jià)員《安裝工程》知識(shí)點(diǎn):臨時(shí)設(shè)施措施費(fèi)
- 152015年二級(jí)建造師《建筑》:訂立勞動(dòng)合同的條件
- 16一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):鋼筋數(shù)量
- 17某紙業(yè)公司廢水處理方案 30p
- 18安全工程師生產(chǎn)法復(fù)習(xí)資料——預(yù)階段
- 192015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(4.29)
- 202015年招標(biāo)師考試招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)考前復(fù)習(xí)指導(dǎo)(86)
- 21工程咨詢概論知識(shí)點(diǎn):我國(guó)注冊(cè)咨詢工程師含義
- 22招標(biāo)師考試的課程輔導(dǎo)
- 232015.5.12咨詢工程師每日一練免費(fèi)在線測(cè)試
- 242015年安全工程師《相關(guān)法規(guī)》模擬訓(xùn)練(2)
- 25清水池施工方案
- 26搭設(shè)和拆除作業(yè)中的安全防護(hù)
- 272015年安全工程師考試《安全生產(chǎn)技術(shù)》全真試題(7)
- 28云南征訂注冊(cè)消防工程師資格考試輔導(dǎo)教材的通知
- 292010年pmp美國(guó)項(xiàng)目管理考試項(xiàng)目溝通管理練習(xí)題及答案4
- 30水泥防滑路面人工拉毛施工
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓