當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
PMP認(rèn)證考試練習(xí)題及參考答案(四十六)
A verbal - face to face
B written
C formal
D informal
E A and C
ans:E
2 Communication plays a major role in:
A Planning
B Organizing
C Controlling
D Directing
E All of the above
ans:E
3 For effective communication, the message should be oriented to the _____.
A Initiator 來源:www.examda.com
B Receiver
C Media
D Management style
E Corporate culture
ans:B
4 Input into the Communications Management Plan includes the following information from the stakeholder analysis:
A Information needs
B Information content
C Frequency of distribution
D Method of distribution
E All of the above
ans:E
5 The following individuals are responsible for determining the content of the Communications Management Plan.
A Project Sponsor
B Task Manager(s)
C Director of Communications
D Project Manager
ans:D
6 The Communications Management Plan should contain the following:
A Communications policy
B Communications media
C Reporting channels
D Selection of appropriate media to meet specific needs
E All of the above
ans:E
7 An effective Project Manager does not share project _____ with the team members.
A Vision
B responsibility
C solution to problems
D accountability
E status
ans:D
8 Using "I" or "My' instead of "most people" or "our group" ______ message credibility.
A decreases
B increases
C has no effect on 來源:考試大
D distorts
E A and B
ans:B
9 The role of the _____ can be invaluable in problem solving.
A recognition seeker
B devils advocate
C dominator
D topic jumper
E A or C
ans:B
10 One of the most common pitfalls in effective communication is:
A not selecting the correct medium
B nor considering the position of the receiver
C assuming that because a message is sent, it has been received
D All of the above.
E A and B
ans:C
11 The most effective team motivator is:
A the visibility of the team's contribution
B the satisfaction of meeting a challenge
C understanding the importance of the project
D the individual's professional challenge
E All of the above.
ans:A
12 Clearly defined group goals are important because they _____.
A motivate team behavior
B cause inner tension within team members until they are met
C encourage member interaction
D All of the above.
E A and C
ans:D
- 1浙江省園林綠化工程施工質(zhì)量驗(yàn)收規(guī)范(新版報(bào)批稿)
- 22015年安全工程師《管理知識》:生產(chǎn)性粉塵作業(yè)分級
- 32015監(jiān)理工程師考試《建設(shè)工程合同管理》習(xí)題精選(102)
- 4武黃城際鐵路武東二號特大橋最后一片鋼橫梁順利吊裝
- 52015年咨詢工程師《工程項(xiàng)目組織與管理》每日一練(2.9)
- 62015年招標(biāo)師法律法規(guī)高頻考點(diǎn):行政監(jiān)督的基本原則
- 7關(guān)鍵路徑法
- 82015年赤峰造價(jià)工程師現(xiàn)場審核地點(diǎn)及時(shí)間
- 92015年造價(jià)工程師考試輔導(dǎo):無效合同
- 102015造價(jià)員考試基礎(chǔ)知識:方案比選方法與造價(jià)控制
- 11工程網(wǎng)絡(luò)計(jì)劃過程中的關(guān)鍵線路是指什么的線路
- 12[江蘇]文化藝術(shù)中心地下室底板防水方案(賽柏斯XYPEX)
- 13駁岸和涵洞施工操作作業(yè)指導(dǎo)書
- 14水泥穩(wěn)定土基層施工要求
- 15砌體結(jié)構(gòu)設(shè)計(jì)注意事項(xiàng)
- 16某高層住宅給排水設(shè)計(jì) 2P
- 17廣州某地下車站防水施工方案
- 18判斷攪拌車磨損
- 192015年合肥的最新招標(biāo)師培訓(xùn)
- 20注冊咨詢工程師2015年考試《經(jīng)濟(jì)政策》習(xí)題(6)
- 21常見學(xué)校樹種名
- 22新建鐵路長大隧道的施工組織設(shè)計(jì)
- 232015年注冊咨詢工程師《工程咨詢概論》習(xí)題(11)
- 24經(jīng)過檢查或必要的鑒定后,什么應(yīng)予以驗(yàn)收確認(rèn)
- 25為什么要排除倉內(nèi)的泌水?
- 26GB 50423-2007 油氣輸送管道穿越工程設(shè)計(jì)規(guī)范宣貫講座 212p
- 27現(xiàn)代咨詢方法與實(shí)務(wù)考點(diǎn):敏感性分析概述
- 28《工程咨詢概論》知識點(diǎn):水平邏輯驗(yàn)證方法
- 292015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練2.21
- 30湖北強(qiáng)力推進(jìn)農(nóng)村危房改造工程
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓