1. which of the following is an element of procurement management:
a. inspection
b. purchasing
c. estimating
d. expeditinghttp://ks.examda.com
e. a, b and d only
ans: e
2. which of the following is most closely associated with pure risk:
a. profit and loss
b. personnel turnover
c. insurance
d. market fluctuations
e. a and d only
ans: c
3. assignable cause or special variation is:
a. is indicated when a point falls outside the control limits.
b. is indicated when a point falls outside the specification limits.
c. is indicated when a run of seven or more points fall above the center line of a standard control chart.
d. is indicated when a run of seven or more points fall below the center line of a standard control chart.
e. a, c, and d.
ans: ehttp://ks.examda.com
4. in the arrow diagramming method (adm), _____ do not consume time or resources.
a. events.
b. activities
c. slack elements.
d. b and c only.
e. all of the above.
ans: a
5. management reserve is generally intended to be used to:
a. implement additional unbudgeted scope
b. compensate for inaccurate estimates
c. cover major unforeseen catastrophes
d. cover unforeseen problems in the project
e. all of the above.
ans: d
6. project management has been proven to be successful because employees get to see the entire effort, from beginning to end, rather than just
small pieces. this could be considered an example of:考試大論壇
a. behavioral modification
b. linking performance to pay
c. positive job reinforcement
d. job enrichment
e. all of the above
ans: d
7. project managers that are available to answer questions, provide guidance when need, and generally do not interfere with day-to-day activities
have a(n) ______ managerial style.
a. autocratic
b. conciliatory
c. ethical
d. facilitative
e. judicial
ans: d
8. the scope baseline once established and approved, is used:
a. as the basis for making future decisions.
b. to accomplish verification measures.
c. to evaluate potential changes.
d. all of the above.
e. a and c only.
ans: d
9. the three most common types of project cost estimates are:
a. order of magnitude, parametric, and budget.
b. parametric, definitive and top down.
c. order of magnitude, definitive and bottom up.來(lái)源:考試大
d. order of magnitude, budget and definitive.
e. analogy, parametric and top down.
ans: d
10. to calculate the expected value of an outcome:
a. divide the value of each outcome by its probability, then add the results.
b. divide the value of the desired outcome by the value all possible outcomes
c. multiply the value of each outcome by its probability, then add the results
d. use linear regression to assess the expected value of the outcome
e. b and d only
ans: c
11. activities with zero time duration are referred to as:
a. critical path activites.
b. noncritical path activities.
c. slack time activities.
d. dummies
e. none of above.
ans: d
12. for a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". the total standard deviation for this
characteristic is:
a. 1.4"
b. 1.2".來(lái)源:www.examda.com
c. 1.0"
d. 0.8"
e. 0.2"
ans: c
- 12015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(12.10)
- 2某縣給水管網(wǎng)改造工程施工組織設(shè)計(jì)44P
- 3非承包施工裝飾面板(磚)內(nèi)容
- 4北京某文化體育中心地下防水施工方案
- 52012一級(jí)建造師《項(xiàng)目管理》:質(zhì)量控制的原理
- 6某桁架結(jié)構(gòu)體育館消防工程施工組織設(shè)計(jì) 39P
- 72015年咨詢工程師《工程咨詢概論》每日一練(1.17)
- 82015招標(biāo)師考試:招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)第八章詳解9
- 92015招標(biāo)師考試教材重點(diǎn):開標(biāo)的程序和內(nèi)容
- 10管道防腐保溫施工方案
- 112015安全工程師《安全生產(chǎn)法及相關(guān)法律知識(shí)》每日一練(10.22)
- 12恩施市某隧道工程施工組織設(shè)計(jì)
- 132015年咨詢工程師《工程咨詢概論》考前練習(xí)題(18)
- 14市政管理與實(shí)務(wù)知識(shí):橋梁工程支架、拱架制作安裝
- 15咨詢工程師考試《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》自測(cè)題(11)
- 16武廣客專重點(diǎn)隧道工程某標(biāo)段(投標(biāo))施工組織設(shè)計(jì)
- 17某公園園路施工組設(shè)計(jì)20p
- 18對(duì)高層建筑施工中的沉降觀測(cè)的探討
- 19造價(jià)工程師土建計(jì)量復(fù)習(xí)要點(diǎn):人工費(fèi)調(diào)整文件
- 20一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):焊接連接
- 21安全工程師考試《法律法規(guī)》知識(shí)要點(diǎn)復(fù)習(xí)(7)
- 222013年云南二級(jí)建造師注銷注冊(cè)申請(qǐng)表
- 23某車站水泥基滲透結(jié)晶性防水涂料施工工藝
- 242015年注冊(cè)安全工程師考試考前模擬試題(10)
- 25招標(biāo)師2015培訓(xùn)哪里好
- 262015年咨詢工程師《工程咨詢概論》每日一練(8.19)
- 272015年招標(biāo)師考試招標(biāo)采購(gòu)案例分析復(fù)習(xí)指導(dǎo)(20)
- 28某工程深基坑防水噴錨網(wǎng)支護(hù)技術(shù)探討
- 29清遠(yuǎn)市2015年安全工程師考試報(bào)名時(shí)間確定:3月31日-5月15日
- 302015年招投標(biāo)《招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)》考點(diǎn):招標(biāo)師職業(yè)權(quán)利
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓