當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
礪志PMP模擬題本周精選13
You are in charge of developing a new product for a bank. Your quality metrics are based on the 80th percentile of each of the last three products developed. This is an example of:
a.Statistical sampling
b. Metrics
c. Benchmarking
d. Operational definitions
Qustions 3:
Scoring models, comparative approaches and benefit contribution are all part of:
a. Constrained optimization models for selecting a project
b. Benefit measurement models for selecting a project
c. Quality measurement techniques
d. Information distribution tools
Qustions 5:
Which of the following models of conflict resolution allows a cooling off period, but seldom resolves the issue in the long term?
a.Problem solving
b. Withdrawal
c. Forcing
d. Smoothing
Qustions 2:
The two closing procedures are called:
a. Contract close out and scope verification
b. Contract close out and administrative closure
c. Project closure and product verification
d. Project closure and lessons learned
Qustions 4:
During the schedule development process the Project Manager may have to go through several iterations of the schedule before establishing the schedule baseline. All of the following are tools and techniques that may be used during this process:
a. Critical Path Method, GERT, Resource Requirements
b. Resource Leveling Heuristics, Mathematical Analysis, Calendars
c. Duration compression, Resource Leveling Heuristics, PERT
d. GERT, PERT, Leads and Lags
Qustions 6:
The “To Complete Performance Index” (TCPI) is calculated by:
a.Subtracting the actual costs to date from the estimate at completion
b.Dividing the budgeted cost of the remaining work by the difference between the estimate at completion and actual costs to date
c.Multiplying the estimate at completion by the cumulative cost performance index
d.Adding the estimate at completion to the actual costs to date and multiplying by the cumulative cost performance index
- 1某道路給水管道改造工程施工組織設(shè)計18P
- 2"中國新型鐵路第一墩"順利封頂 可抗強(qiáng)烈地震
- 3某特大橋13#墩承臺單壁鋼吊箱圍堰設(shè)計與施工
- 4二級建造師考試復(fù)習(xí)總結(jié):砌體結(jié)構(gòu)的特點(diǎn)及構(gòu)造要求
- 5園林灌溉系統(tǒng)管網(wǎng)水力學(xué)計算
- 6西環(huán)高鐵前10個月完成投資96億元
- 7西安某實(shí)驗(yàn)樓衛(wèi)生間防水工程施工工藝(聚胺酯涂膜)
- 8T梁自動噴淋養(yǎng)生工法
- 9造價工程師建設(shè)工程造價管理復(fù)習(xí)資料——合同履行的特殊規(guī)則
- 102015年安全工程師《安全生產(chǎn)法及相關(guān)》輔導(dǎo)資料(4)
- 112015安全工程師《安全生產(chǎn)管理知識》典型習(xí)題(三)
- 12監(jiān)理工程師考試備考經(jīng)驗(yàn)——題海戰(zhàn)術(shù)
- 132015年安全工程師《生產(chǎn)技術(shù)》:客運(yùn)索道使用安全
- 142015年咨詢工程師《工程咨詢概論》練習(xí)題20
- 15性價比法決標(biāo)應(yīng)注意把握的三個問題
- 16振沖法施工有哪些質(zhì)量檢驗(yàn)?
- 172015年招標(biāo)師考試法律法規(guī)高頻考點(diǎn):開標(biāo)參與人
- 18某工程屋面防水施工方案(氯化聚乙烯防水卷材)
- 19[全國]2013年建筑業(yè)AAA級信用企業(yè)名單
- 20軟質(zhì)景觀施工組織方案
- 212015監(jiān)理工程師《基本理論與相關(guān)法規(guī)》模擬試題(六)
- 222015年新疆人事考試中心公布安全工程師考務(wù)文件
- 23非承包工程涂料裝飾工程 內(nèi)容
- 24現(xiàn)代咨詢方法與實(shí)務(wù)考點(diǎn):效果計量單位的選擇
- 25湖南電監(jiān)辦“電力工程項(xiàng)目造價專項(xiàng)監(jiān)管報告”報送內(nèi)容
- 26咨詢工程師2015年考試《項(xiàng)目組織與管理》練習(xí)題(10)
- 27一級建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):平均運(yùn)距算
- 28某縣城日供水4萬噸給水管網(wǎng)施工組織設(shè)計115P
- 29某中學(xué)遷擴(kuò)建工程施工平面布置圖
- 30項(xiàng)目計劃在項(xiàng)目管理中的重要作用
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓