監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價咨詢管理系統(tǒng) | 工程設(shè)計管理系統(tǒng) | 甲方項目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關(guān)閉
軟件項目管理工具

當(dāng)前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具

礪志PMP模擬題本周精選11

申請免費(fèi)試用、咨詢電話:400-8352-114

Qustions 1:
A change control system should include all the following except-

a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review

Qustions 3:

Two fundamental objectives of project control are to--

a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate

Qustions 5:

The project plan is important in change control because it--

a.Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project

Qustions 2:
Written changes orders should be required on --

a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified

Qustions 4:

The principal sources of project failure are-


a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control

Qustions 6:

Interface management is --

a.Considered to be one of the easier aspects of implementing the project plan
b.Primarily concerned with the technical issues associated with linking system components in a configuration
c.Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d.The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget
發(fā)布:2007-03-02 10:57    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項目管理工具其他應(yīng)用

項目管理工具 禪道項目管理軟件 夢龍項目管理軟件 微軟項目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項目計劃軟件 項目進(jìn)度管理軟件 軟件項目管理工具 材料管理軟件 工程項目管理軟件系統(tǒng) 項目管理系統(tǒng) 施工管理軟件 建筑工程項目管理軟件 工程管理軟件