PMP美國項目管理認證模擬題精選7
A project is an ideal environment in which to use the technique of management by objectives because--
a. Project management involves setting organizational objectives
b. Projects generally are handled through a matrix management environment
c. Project managers’ responsibilities are defined in terms of corporate objectives
d. All projects should be strongly oriented toward goals and objectives
Qustions 3:
All the following are examples of benefit measurement methods of project selection except--
a. Benefit-cost ration
b. Payback period
c. Peer review
d. Multiobjective programming
Qustions 5:
Which of the followin
is a tool or technique used for project initiation--
a. Alternatives identification
b. Configuration management
c. Decision models
d. Decomposition
Qustions 2:
Each project phase is marked by completion of one or more deliverables. The deliverable for the concept phase of a project is the--
a. Project plan
b. Statement of work
c. Project charter
d. Resource spreadsheet
Qustions 4:
Change requests may result from--
a. A review of the project charter
b. A review of the performing organization’s strategic plan
c. Enhanced problem-solving skills on the part of the project team
d. An error or omission in scope definition
Qustions 6:
The project’s scope change control system is --
a. A collection of formal, documented procedures to define the steps by which official project documents may be changed
b. A documented process used to apply technical and administrative direction and surveillance to identify and document functional and physical characteristics of items, record and report change, control change, and audit the items and system to verify conformance to requirements
c. A set of procedures by which project scope may be changed, including the paperwork, trackingsystems, and approval levels necessary for authorizing change
d. Mandatory for use on projects so that the scope management plan cannot be changed without prior review and sign-off
- 12015安全工程師《安全生產(chǎn)管理知識》每日一練(12.31-1.6)
- 22015年咨詢工程師考試《宏觀經(jīng)濟與發(fā)展》模擬題(2)
- 3中鐵十四局集團五公司云桂鐵路田東制梁場低位安全過隧道
- 4安全工程師安全生產(chǎn)法復(fù)習(xí)資料——費率的制定
- 5二建復(fù)習(xí)資料抹面砂漿
- 62015年注冊咨詢工程師《工程咨詢概論》習(xí)題(13)
- 72015招標師考試:招標采購專業(yè)實務(wù)第七章詳解10
- 8淺析信息化時代施工項目信息管理的特點與對策
- 9【經(jīng)驗之談】二級建造師考試報名方式是怎樣的?
- 102015年造價工程師考試輔導(dǎo):合同格式條款
- 11【感謝名師】考試通過發(fā)感言 一次通關(guān)就這么簡單
- 12二級建造師《法規(guī)》考點狂背:施工企業(yè)的從業(yè)資格制
- 13招標師2015年的考前輔導(dǎo)
- 142015年安全工程師《安全生產(chǎn)管理知識》精華習(xí)題(28)
- 15地面石材、墻面?;u施工方法及質(zhì)量控制措施
- 16造價工程師復(fù)習(xí)資料:經(jīng)營者不得有的不正當價格行為
- 17一級建造師實務(wù)復(fù)習(xí)要點:橫道圖
- 18工程事故責(zé)任的認定與追究
- 19市政管理與實務(wù)知識:濾池濾板、濾料施工質(zhì)量控制
- 20如何精確建立項目的范圍
- 21監(jiān)理工程師資格考試輔導(dǎo)模擬試題(建設(shè)工程監(jiān)理基本理論與相關(guān)法規(guī))
- 222008年注冊安全工程師執(zhí)業(yè)資格考試有關(guān)工作的通知(考試介紹)
- 23逐字逐句讀課本 考試大綱扣緊點
- 242015年招標師《案例分析》:政府采購項目招標公告發(fā)布
- 25某國際機場航站區(qū)擴建工程給排水施工組織16P
- 26各種結(jié)構(gòu)地基變形有哪些驗算內(nèi)容?
- 27二級建造師培訓(xùn)視頻免費觀看
- 282015年招標師考試:招標實務(wù)問答(56)
- 29評標報告該怎么編
- 302015年注冊咨詢工程師《工程項目組織管理》模擬題(42)
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓