PMP美國項(xiàng)目管理認(rèn)證模擬預(yù)測習(xí)題3
A.Make or buy analysis
B.Utilize application knowledge and historical information fromprevious projects
C.Conducting benefit cost analysis
D.Utilizing project management information system
1.你被任命為一個(gè)項(xiàng)目經(jīng)理,負(fù)責(zé)設(shè)計(jì)開發(fā)和執(zhí)行一套企業(yè)資源規(guī)劃系統(tǒng)(即erp系統(tǒng))。你將與組織外的供貨商簽約,后者提供ERP軟件。你認(rèn)識到詳細(xì)規(guī)劃這些實(shí)時(shí)系統(tǒng)是成功的關(guān)鍵,因此組建了一個(gè)由重要股東組成的小組準(zhǔn)備計(jì)劃。為了幫助項(xiàng)目計(jì)劃的制定,你應(yīng)該:
A.分析是進(jìn)行“自造”還是“購買”
B.利用課程知識和以前項(xiàng)目積累的歷史信息
C.收益—成本分析
D.利用項(xiàng)目管理信息系統(tǒng)
2.You are running a communications project. The project deliverables andsystem requirements have been agreed upon by the client, the management andother stakeholders. Up to now, the project is progressing on schedule and stakeholdersseem to be content with it. Recently you are notified of a new regulation from governmentauthorities that would cause changes to the performance factor of the project. In order to integrate the changeinto the project plan, you should:
A.Convene a CCB meeting
B.Change the work package, schedule and project plan to meet the newrequirement
C.Prepare a change request
D.Notify stakeholders of the coming new project plan
2.你正在進(jìn)行一個(gè)通信項(xiàng)目。有關(guān)產(chǎn)品和系統(tǒng)的要求已經(jīng)確定并得到了客戶,管理階層和其它股東的同意。工作正在按照時(shí)間表進(jìn)行之中。到目前各方對進(jìn)展似乎都很滿意。你得知一項(xiàng)新的政府管理方面的要求將會引起項(xiàng)目的一個(gè)績效指標(biāo)的變更。為使這個(gè)變更包括在項(xiàng)目計(jì)劃之中,你應(yīng)該:
A.召集一次變更控制委員會會議
B.改變工作分解包,項(xiàng)目時(shí)間表和項(xiàng)目計(jì)劃以反映該管理要求
C.準(zhǔn)備變更請求
D.通知受到影響的股東將要對項(xiàng)目立即采取的新計(jì)劃
3.Which of the following is not one type of communication barriers?
A.Blockers
B.Filtering
C.Unfamiliar with the subject
D.Noise
3.哪一種不屬于溝通的一種障礙類型?
A.阻礙
B.過濾
C.不熟悉專題
D.噪音
4.Your project schedule is tight and in danger of falling behind whentwo team members start disrupting status meetings by arguing with each other. As project manager, what is theBEST thing you can do?
A.Separate the two until the project is back on track
B.Speak with each team member and give each a verbal warning
C.Discuss the problem with the manager of the two team member
D.Meet with both team members and their manager to determine thesource of conflict
4.你的項(xiàng)目計(jì)劃進(jìn)度很緊,而且處于進(jìn)度落后的危險(xiǎn)之中,這時(shí)兩個(gè)團(tuán)隊(duì)成員吵了起來,干擾了正在進(jìn)行的狀態(tài)會議。作為項(xiàng)目經(jīng)理你最好應(yīng)該:
A.把這兩個(gè)人分開,直到項(xiàng)目恢復(fù)正規(guī)
B.分別和他們談話,給于口頭警告
C.和他們的經(jīng)理討論這個(gè)問題
D.和他們兩人以及他們的經(jīng)理討論確定沖突的來源
5.What tool is used to describe the coding structure used to reportfinancial information in its general ledger?
A.Chart of accounts
B.Balance sheet
C.WBS dictionary
D.Code of accounts
5.什么工具用于描述財(cái)務(wù)報(bào)告信息在公司總帳目中的編碼結(jié)構(gòu)?
A.會計(jì)科目
B.平衡表
C.WBS詞典
D.記賬碼
6.Your company is considering investing in several very large projects. You need a rough idea of whatthese projects will cost. What type of cost estimate should you request?
A.RAM
B.Budgetary
C.Bottom-up
D.ROM
6.你的公司在考慮投資幾個(gè)大型項(xiàng)目。你需要大致了解這些項(xiàng)目的成本。你使用什么估算?
A.RAM
B.預(yù)算估算
C.自下而上
D.量級估算
7.What type of chart would you use to show cumulative earned valueanalysis data?
A.Gantt chart
B.S - curve
C.Histogram
D.Bar chart
7.哪個(gè)圖是用來顯示累計(jì)掙值分析的?
A.甘特圖
B.S曲線
C.直方圖
D.橫道圖
8.Which of the following statements is true?
A.Project teams should focus on delivering the required levels ofquality, not grade.
B.Low quality is not always a problem.
C.Low grade is not always a problem.
D.Grade is a category given to items with the same functional use andtechnical characteristics.
8.下面哪一種說法是正確的?
A.項(xiàng)目經(jīng)理應(yīng)該專注于達(dá)到規(guī)定的質(zhì)量而不是等級
B.低的質(zhì)量并不總是一個(gè)問題
C.低的等級并不總是一個(gè)問題
D.等級可以歸為具有相同功能和相同技術(shù)特特征的品類
9.Which quality tool or technique, applied most often in productdesign, helps identify which factors might influence specific variables byusing statistical methods?
A.Control charts
B.Design of experiments
C.Six sigma
D.Statistical sampling
9.哪個(gè)質(zhì)量工具或方法最常用于產(chǎn)品設(shè)計(jì),使用統(tǒng)計(jì)學(xué)方法幫助識別哪個(gè)參數(shù)對特定的變量影響最大?
A.控制圖
B.試驗(yàn)設(shè)計(jì)
C.六西格瑪
D.統(tǒng)計(jì)抽樣
10.Scrap and rework are examples of what type of cost of quality?
A.Appraisal
B.Prevention
C.Internal failure
D.External failure
10.廢料和返工是哪一種質(zhì)量成本的例子?
A.評估
B.預(yù)防
C.內(nèi)部失敗
D.外部失敗
相關(guān)試題:
添加應(yīng)用,免費(fèi)套題體驗(yàn)
PMP美國項(xiàng)目管理認(rèn)證模擬預(yù)測習(xí)題1
PMP考試全真模擬題及答案(樣題)
PMP模擬習(xí)題匯總(附參考答案)
- 12015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(12.23)
- 2沉樁達(dá)不到設(shè)計(jì)控制要求的原因
- 3某市政排水工程施工方案15P
- 42015年二級建造師《公路》重點(diǎn):建筑幕墻常用玻璃
- 5專家解析招標(biāo)采購案例分析教材中案例(3)
- 6北京某藥廠制劑工廠室內(nèi)防水工程施工方案(聚氨酯、APP卷材)
- 7安全工程師考試知識要點(diǎn):安全生產(chǎn)的監(jiān)督管理2
- 8某道路古樹游園綠化工程施工組織設(shè)計(jì)
- 9全球首個(gè)燈飾建材云電商平臺——網(wǎng)材燈飾網(wǎng)
- 10上海首條會“自主呼吸”的隧道開建
- 11安全工程師《法律法規(guī)》習(xí)題班講義精選(127)
- 12云桂鐵路廣西段左江特大橋首孔箱梁架設(shè)完成
- 13建筑安裝工程費(fèi)用直接工程費(fèi)中的人工費(fèi)包括生產(chǎn)工人的什么
- 142012一級建造師《水利水電》:安全生產(chǎn)監(jiān)督檢查內(nèi)容
- 15PMP認(rèn)證考試練習(xí)題及參考答案(三十五)
- 162015年招標(biāo)師:招標(biāo)投標(biāo)行政爭議解決方式
- 17一級建造師法規(guī)及相關(guān)知識復(fù)習(xí)要點(diǎn):建設(shè)工程債
- 18熱烈祝賀網(wǎng)校二建學(xué)員高分通過
- 19造價(jià)工程師技術(shù)與計(jì)量復(fù)習(xí)要點(diǎn):柱的工程量公式
- 202015年造價(jià)工程師《理論與法規(guī)》專家分析(13)
- 212015年招標(biāo)師《專業(yè)實(shí)務(wù)》:造價(jià)控制風(fēng)險(xiǎn)的評估
- 222015年咨詢工程師《工程項(xiàng)目組織與管理》每日一練(2.2)
- 23【招標(biāo)師考試】項(xiàng)目管理與招標(biāo)采購第二章:施工監(jiān)理工作的內(nèi)容
- 242015年咨詢工程師《項(xiàng)目決策分析與評價(jià)》每日一練(11.21)
- 25招標(biāo)師法律法規(guī):評標(biāo)時(shí)標(biāo)底的作用
- 26某大橋預(yù)應(yīng)力混凝土連續(xù)箱梁的施工
- 272013年二級建造師《施工管理》每日一練(12.14)
- 28《建筑信息模型(BIM)在設(shè)計(jì)中應(yīng)用研究》課題
- 29攪拌車被浸后三步簡單處理
- 30蘭渝鐵路西秦嶺隧道TBM掘進(jìn)至分界里程
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓