PMP認(rèn)證考試練習(xí)題(十一)(中英文)

申請免費(fèi)試用、咨詢電話:400-8352-114

1. A door panel for a new car is inspected prior to installation on the automobile. This is an example of:
Prevention
Variable Sampling
Quality Assurance
Quality Control

新汽車的儀表盤在安裝前已經(jīng)被檢驗. 這是下列那一種的例子:
預(yù)防
可變樣本
質(zhì)量保證
質(zhì)量控制

2. A thunderstorm caused intermittent power outages during a 24-hour period. When the day’s production run was sampled it was found that over 50% of the products produced were defective. These defects are an example of :
Variable sampling
Special causes
Prevention
Inspection
Random causes

一場雷暴造成24小時的停電. 白天生產(chǎn)的產(chǎn)品被發(fā)現(xiàn)有50%的不合格. 此種不合格是下列那一個的例子:
可變樣本
特殊原因
預(yù)防性
檢查
隨即原因

3. A:PM wanted to show management ,visually, how quality controls were affecting processes. the best tool to accomplish this is :
diagrams
Histograms
Flowcharts
Control charts
Statistical samples

項目經(jīng)理想向管理層顯示可視的質(zhì)量控制對過程的影響. 完成它最好的工具是:
Pareto 圖
柱狀圖
流程圖
控制圖
統(tǒng)計樣本

4. A PM is developing the projects budget and wants to have adequate resources to implement a solid quality control program. His project will cost approximately $110.00.What is the minimum amount he should include in the project budget for the quality program?
$10,000
$7,500
$6,135
$3,300
$5,500

一個項目經(jīng)理正項目預(yù)算同時想使用適當(dāng)?shù)馁Y源完成穩(wěn)固的質(zhì)量控制程序. 它的項目成本大約是$110.00,他應(yīng)當(dāng)在項目預(yù)算中對質(zhì)量的預(yù)算最少做多少?
$10,000
$7,500
$6,135
$3,300
$5,500

5. Repeating the initiating processes at the beginning of each phase to keep the project focused on:
Interaction between phases.
The details of the project using rolling wave planning
Process group overlapping within each phase.
Business needs.

在每一階段初期重復(fù)立項過程以保證項目著重于:
階段間的交互
項目運(yùn)用滾動波浪計劃的細(xì)節(jié)
在每一階段工藝組有重疊
商業(yè)需要

6. In the integration management process, the project development uses the outputs of the other planning processes to create a consistent, coherent document that can be used to guide both project______
Execution, control
Control, termination
Scope management, integration
Initiation and close-out.

在綜合管理程序中,項目開展使用其他計劃過程的輸出以形成一個持續(xù)的,連貫的文件以便用于同時指導(dǎo)項目的___.
實施,控制
控制, 終止
范圍管理,綜合
立項,收尾

7. Of the PMBOKTM’s five project management process groups, which group is a common thread that spans the majority of these processes from the start to finish?
Executing
Planning
Controlling
Initiating
Closing

PMBOKTM’s的五個項目管理過程組中,哪一個過程組由始至終作為共同的線索跨越了絕大多數(shù)的過程?
實施
計劃
控制
立項
收尾