PMP認證考試練習(xí)題(二)(中英文)
1. Cost estimating can be best described by which of the following:
The process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project.
The process of assembling and predicting costs of a project over its life cycle.
The process of establishing budgets, standards, and a monitoring system by which the investment cost of the project can be measured and managed.
The process of gathering, accumulating, analyzing, monitoring, reporting, and managing the costs on an on-going basis.
以下描述中哪一個最貼切的描述了費用估算:
是對未來項目進行過程中發(fā)生的可能性,不確定性及夸大性進行趨勢估定的方法
是組合并預(yù)計項目超出其生命周期費用的方法
是制定預(yù)算,標準及監(jiān)測系統(tǒng)以衡量并管理項目投資成本的方法
d. 是在不斷進行的基礎(chǔ)上搜集,分析,檢測,報告并管理成本的一種方法
2. What is the purpose of the work breakdown structure (WBS)?
The WBS allows the project manager to delegate responsibility of all of the project activities.
The WBS is a narrative description of the work required for the project.
The WBS describes the total program as a summation of subdivided elements.
The WBS is a statement of what will be made, how many units will be made, and when they will be made.
工作分解結(jié)構(gòu)(WBS)的目的是
WBS允許項目經(jīng)理承擔(dān)所有項目活動的責(zé)任.
WBS是項目所需工作的文字性描述
WBS將整個程序描述為細分要素的匯總
WBS 描述了做什么, 做多少以及什么時候做
3.Which type of project cost estimate is the most accurate?
Preliminary
Definitive
Order of magnitude
Conceptual
那一類項目成本估算最精確?
初步估算
最終估算
數(shù)量級估算
概念估算
4. Which of the following type of contracts is most preferable to the contractor doing the project work?
Cost plus fixed fee
Fixed price
Fixed price plus incentive fee
B and c
以下那種合同更有利于承包商進行項目工作?
成本加固定費用合同
固定價格合同
固定價格加獎勵費用合同
B和C
5. To assist in budget control, it is suggested that the estimate occur at the _______ level of the WBS.
Highest
Lowest
Major work effort
Third
為便于預(yù)算控制,建議在WBS的______階段進行估算.
最高
最低
主要工作成果
第三
6. Cost Variance (CV) is which of the following equations?
CV=BCWP-BCWS
CV=BCWP-ACWP
CV=SV/BCWS
A and c
費用偏差的公式為
成本偏差(CV)=已完成工作預(yù)算成本(BCWP)-計劃工作預(yù)算成本(BCWS)
成本偏差(CV)=已完成工作預(yù)算成本(BCWP)-完成工作實際成本(ACWP)
成本偏差(CV)=進度偏差(SV)除以計劃工作預(yù)算成本(BCWS)
A和c
7. Cost controls can be best described by which of the following?
The process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project
The process of assembling and predicting cots of project over its life cycle
The process of establishing budgets, standards, and a monitoring system by which the investment cost of the project can be measured and managed
The process of gathering, accumulating, analyzing, monitoring, reporting, and managing the costs on an on-going basis
以下哪一條最貼切的描述了成本控制?
是對未來項目進行過程中發(fā)生的可能性,不確定性及夸大性進行趨勢估定的方法.
是組合并預(yù)計項目超出其生命周期的費用的方法
是制定預(yù)算,標準及監(jiān)測系統(tǒng)以衡量并管理項目投資成本的方法
是在不斷進行的基礎(chǔ)上搜集,積累,分析,檢測,報告并管理成本的一種方法.
8. Which one of the following is NOT a trade-off decision that must be made in the development of the project plan?
Whether to use skilled or unskilled laborers.
The amount of profit vendors should make versus the profit other vendors have received in the past.
Manufacturing in-house or sub-contracting ort the work.
The importance of cost versus quality.
以下哪一項不是項目計劃過程中可能發(fā)生的換位權(quán)衡的決定?
是否使用有技能的勞動力或者無技能的勞動力
賣方應(yīng)當(dāng)獲得的利潤額同其他賣方在過去獲得的利潤比較
自己制造或者分包
成本重要性同質(zhì)量比較
9. The BCWS=$250, the ACWP=$350, and the BCWP=$200, Calculate the Cost Variance.
-$150
$150
-$50
$50
計劃工作預(yù)算成本(BCWS)=$250, 完成工作實際成本(ACWP)=$350, 已完成工作預(yù)算成本(BCWP)=$200,計算成本偏差
-$150
$150
-$50
$50
10. One of the types of cost estimation is Order of Magnitude. This estimate.
Is performed when detailed information is available.
Is performed when little if any information is available.
Is used in the beginning of the project conceptualization.
B and c
數(shù)量級估算是費用估算的一種.這種估算:
當(dāng)有詳細信息可用時實施
當(dāng)僅有很少信息可用時實施
在項目概念化初期運用
b和c
相關(guān)練習(xí)題:
PMP認證考試練習(xí)題(三)(中英文)
PMP認證考試最新練習(xí)題及參考答案匯總
精品推薦:
PMP全真試題精選
歡迎進入在線試聽:項目管理網(wǎng)上輔導(dǎo),熱招中?。?/STRONG>
更多信息請進入:項目管理海量題庫 考試大項目管理論壇
- 12013年二級建造師《法規(guī)及相關(guān)知識》每日一練(10.31)
- 2工程項目組織與管理知識點:工程項目范圍確認
- 34縱4橫 武進規(guī)劃建設(shè)8條快速通道共220公里
- 4安全工程師執(zhí)行時間
- 5酸堿度試驗進行步驟?
- 62013年吉林二級建造師注冊證書、執(zhí)業(yè)印章污損更換申請表
- 7“十二五”期間中國建筑將投入500億元參與福建建設(shè)
- 8招標師培訓(xùn)哪里好
- 92015招標師專業(yè)實務(wù)輔導(dǎo):招標投標的行政監(jiān)督
- 10安全工程師案例分析復(fù)習(xí)要點:危險有害因素
- 11安全工程師考試《安全生產(chǎn)技術(shù)》:礦山粉塵檢測方法
- 12《項目決策分析與評價》知識點:政府投資項目決策(審批)程序
- 13北京某別墅群屋面防水施工方案
- 14設(shè)備的一級建造師工程經(jīng)濟復(fù)習(xí)要點:設(shè)備的使用壽命
- 152015造價工程師《計價與控制》精簡教材知識點(13)
- 162015年咨詢工程師《工程咨詢概論》考前練習(xí)題(2)
- 17咨詢工程師2015年考試《組織與管理》習(xí)題(1)
- 18談工程建設(shè)項目變更形成的現(xiàn)狀及措施
- 192015年咨詢工程師《工程項目組織與管理》每日一練9.28
- 20容器零部件設(shè)計培訓(xùn) 46p
- 21監(jiān)理工程師2015年《工程質(zhì)量與進度控制》習(xí)題(2)
- 22熱力管網(wǎng)管道施工方案15P
- 23《項目管理與招標采購》輔導(dǎo):工程建設(shè)項目社會評價
- 24某紙業(yè)公司廢水處理方案 30p
- 25薄抹灰EPS保溫板外墻保溫施工工藝(PPT)
- 26廣東新鄉(xiāng)縣鳳鳴湖工程造價審核項目詢價公告
- 27[浙江]2008年度注冊安全工程師執(zhí)業(yè)資格考試5月15日至21日報名
- 28框排架廠房施工方案56p
- 29公證在招標投標中的作用
- 30[云南?。?6造價工程師資格考試報名
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓