當前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具
PMP認證考試練習題及參考答案(二十六)
A senior management
B the customer
C the project manager
D both A and C 來源:www.examda.com
E None of the above.
ans:D
2 A program is characterized as:
A a grouping or related tasks lasting one year or less.
B a unique undertaking having a definite time period.
C a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.
D a project with a cost over $1 million.
E None of the above.
ans:C
3 Creation of project objectives:
A allows for data collection and analysis and progress reporting against which standards of performance can be measured.
B is accomplished by selection of measurable variables against which performance can be judged.
C is required before funding of the project by the project sponsor.
D all of the above.
E A and B only
ans:E
4 A project is defined as:
A a coordinated undertaking of interrelated activities directed toward a specific goal that has a finite period of performance.
B a large, complex undertaking with many objectives, multiple sources of funding, and a not discernible end point.
C an undertaking of interrelated activities directed toward a specific goal that can be accomplished in less than one year.
D a group of activities headed by a project manager who has cradle-to-grave cycle responsibility for the end product.
E All of the above.
ans:A
5 The use of the project reports:
A are not necessary on small projects
B provides a means whereby various levels of authority can judge project performance
C provides insight into project areas and the effectiveness of the control systems
D All of the above
E B and C
ans:E
6 Documented work authorization provide:
A a means of effective internal coordination of the project's activities.
B an audit trail of all work authorized from project initiation to completion.
C a means for communication of work activity between the project manager and the performing activities.
D All of the above 考試大論壇
E A and B only.
ans:D
7 The project life-cycle can be described as:
A project concept, project planning, project execution, and project close-out.
B project planning, work authorization, and project reporting.
C project planning, project control, project definition, WBS development, and project termination.
D project concept, project execution, and project reporting.
E All of the above.
ans:A
8 A Work Breakdown Structure:
A assures all work is identified
B subdivides the project into manageable segments
C provides the project sponsor with a time-phase task summary
D both A and B
E All of the above.
ans:D
9 Scope Management:
A entails managing the project's work content.
B is a subset of configuration management and as such is performed by CM specialists.
C is concerned with naming all activities performed, the end products which results and the resources consumed.
D is not a concern of the project manager.
E None of the above.
ans:C
10 Feasibility studies occur in which life cycle phase (s)?
A Conceptual
B Conceptual or Development
C Execution
D Preliminary planning
E any life cycle phase 來源:www.examda.com
ans:A
11 Good project objectives must be:
A General rather than specific
B Established without considering resource bounds
C Realistic and attainable
D Overly complex
E Measurable, intangible and verifiable
ans:C
12 Researching, organizing and recording pertinent information is called:
A Alternative analysis
B Information gathering
C Configuration management
D Post project analysis
E All of the above
ans:B
- 12015年安全工程師生產(chǎn)管理知識模擬精選匯總
- 2基坑支護的設置原則
- 3陶瓷行業(yè)旺季提前到來,戰(zhàn)事如何?
- 42015年咨詢工程師《工程咨詢概論》每日一練5.28
- 5[四川]17個鐵路項目融資需求約117億元
- 6工程項目組織與管理知識點:招標資格與招標備案
- 7石材破損修復滲透粘接修補技術
- 8長琿公路敦化至延吉段某隧道工程(實施)施工組織設計
- 9[江蘇]電子廠房施工平面布置圖
- 10安全工程師《安全生產(chǎn)管理》第五講講義精選(20)
- 11造價工程師土建計量復習要點:05ZJ001屋57做法
- 12合肥地標建筑"省城鄉(xiāng)規(guī)劃展示館"正式開工建設
- 132015年安全工程師《生產(chǎn)管理》自測題(4)
- 14路拌法石灰穩(wěn)定土施工
- 15安全工程師安全生產(chǎn)法復習資料——申請行政復議或者提起行政訴訟
- 162015一級建造師《水利水電》知識點串講(20)
- 17混凝土泵液壓系統(tǒng)發(fā)熱現(xiàn)象的危害
- 18中交二航局承建的深茂鐵路項目開工
- 19[佛山市]06年安全工程師考試報名通知
- 20江西贛州加強歷史文化名村保護力度
- 21一級建造師法規(guī)復習要點:抵押權設立的問題
- 22金沙江魯某水電站保通隧道工程施工組織設計
- 232015年安全工程師考試《安全生產(chǎn)技術》習題(5)
- 24大道截污次支管工程跨路管道施工專項組織設計方案
- 25交通建設頂層方案出爐 將打造“軌道上的京津冀”
- 262015年招標師《專業(yè)實務》輔導:工程建設項目安全、環(huán)境管理
- 272015年招標師考試每日一練(7月20日)
- 282015年長春造價工程師報名入口
- 292015年咨詢工程師《工程項目組織與管理》每日一練(3.13)
- 30褶皺有哪些基本類型?
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓