1. things that distort, distract, or muddle the communication process are called:
a. noise
b. selective filtering
c. selective perception
d. medium problems
e. all of the above.http://ks.examda.com
ans: a
2. which is not a consideration in a make or buy decision?
a. cost factors (least cost alternatives)
b. competitors' method of sourcing
c. existence of sufficient administration/technical personnel
d. political and social factors
e. none of the above.
ans: b
3. a work breakdown structure:
a. assures all work is identified
b. subdivides the project into manageable segments
c. provides the project sponsor with a time-phase task summary
d. both a and b
e. all of the above.來(lái)源:考試大
ans: d
4. a project manager can exchange information with the project team using which media?
a. tactile
b. audio
c. olfactory
d. visual
e. all of the above.
ans: e
5. during project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. the baseline
schedule:
a. now becomes the new schedule, including the changes, and the original baseline is disregarded.
b. is still the original baseline but annotated to reflect that a change has taken place.
c. is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
d. is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)
e. is the same since baseline schedules cannot change once the development phase is completed.
ans: c
6. sensitivity analysis can be used in risk analysis to:
a. substitute for uncertainty analysis in risk quantification
b. estimate the level of risk aversion adopted by management
c. estimate the effect of change of one project variable on the overall project
d. a and b
e. all of the above.來(lái)源:www.examda.com
ans: c
7. the pareto principle is a technique used by quality managers to determine which quality control problems of a particular service or
manufacturing process should be corrected. which of the following statements represents the philosophy of the principle?
a. in order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be
corrected.
b. the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vital
few problems.
c. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
d. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. the remaining 20% are not financially
worthy of improvement efforts.
e. a and d
ans: b
8. the budgeted cost of the work performed (bcwp) for a task that has just been completed can be calculated by:
a. multiplying the actual hours worked on the project by the budgeted labor rate.
b. multiplying the budgeted hours to complete the task by the budgeted labor rate.
c. dividing the actual hours required to complete the task by the budgeted labor rate.
d. cannot be determined.
e. none of the above來(lái)源:考試大
ans: b
9. the project manager has, as a prime responsibility, to assure proper integration of activities. in which organizational form does the project
manager probably have the easiest time in integrating work?
a. matrix
b. classical
c. expediter
d. coordinator
e. pure project
ans: e
10. there are four methods of government procurement. which is not one of these methods?
a. assistance
b. sealed bidding
c. competitive proposals
d. acquisition考試大(www.Examda。com)
e. small purchases
ans: d
11. a scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. the
barriers which could hinder the lab techs. ability to filter the information include all of the following except:
a. language and semantics
b. culture and ethics
c. intelligence and knowledge base
d. reputation, authority, organizational status and position
e. relative location of the lab to the scientist's office
ans: e
12. many companies self insure against some risk. problems which can arise from self-insurance include:
a. failure to reserve funds to handle worst case scenarios (low probability events) resulting in severe financial damage to the company
b. stiff competition from insurance companies
c. confusion of business risks with insurable risks.
d. a and c
e. all of the above.
ans: d
- 1鐵路隧道土建工程實(shí)施性施組設(shè)計(jì)119頁(yè)(新奧法 2013年)
- 2需要改進(jìn)的鋼結(jié)構(gòu)缺點(diǎn)
- 3[山東]2008年度注冊(cè)安全工程師執(zhí)業(yè)資格考試7月15日前報(bào)名
- 4[臺(tái)州市]06年安全工程師考試報(bào)名通知
- 5重慶境內(nèi)某長(zhǎng)大隧道施工組織設(shè)計(jì)
- 6高速公路隧道工程實(shí)施性施工組織設(shè)計(jì)(新奧法 115頁(yè))
- 7工程碩士之電子與通信工程領(lǐng)域簡(jiǎn)介
- 82015年咨詢工程師《工程咨詢概論》每日一練(7.3)
- 9二級(jí)建造師《法規(guī)》考點(diǎn)狂背:建設(shè)工程質(zhì)量法律制度
- 102015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練7.29
- 112015年安全工程師《安全生產(chǎn)法及法律知識(shí)》鞏固練習(xí)(5)
- 12某石化工程地下給排水管道施工組織設(shè)計(jì)24P
- 13市政園林景觀施工組織設(shè)計(jì)
- 14現(xiàn)代咨詢方法與實(shí)務(wù)知識(shí)點(diǎn):建設(shè)規(guī)模
- 152013年二級(jí)建造師《施工管理》知識(shí)點(diǎn)整理:材料費(fèi)
- 16預(yù)防樁體上浮措施
- 17對(duì)加強(qiáng)建筑企業(yè)施工現(xiàn)場(chǎng)管理的探討
- 18井下透水時(shí)之應(yīng)急措施
- 19[天津]2007年注冊(cè)安全工程師考試成績(jī)11月16日開(kāi)始網(wǎng)上查詢
- 20《項(xiàng)目決策分析與評(píng)價(jià)》知識(shí)點(diǎn):給水系統(tǒng)
- 21小高層項(xiàng)目工程管理責(zé)任范圍?
- 22水泥攪拌車行駛中振擺故障的診斷與排除
- 232012年一級(jí)建造師《經(jīng)濟(jì)》:短期借款的利息支付方式
- 24軟件項(xiàng)目管理是建設(shè)工程安全管理的重要內(nèi)容
- 252015年一級(jí)建造師輔導(dǎo)資料:焊接工藝評(píng)定
- 26浙江深化農(nóng)村改革:“三權(quán)到人、權(quán)隨人走、帶權(quán)進(jìn)城”
- 272015招標(biāo)師考試:招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)第八章詳解4
- 282015年咨詢工程師《方法與實(shí)務(wù)》考點(diǎn):借款償還期
- 29景觀設(shè)計(jì)施工圖
- 30老河口市2015年安全工程師考試報(bào)名時(shí)間確定:4月15日至24日
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓