1. a proven effective means to insure quality conformance is to:
a. delegate accountability to subordinates
b. revise quality specifications to match quality measurements
c. train workers in proper quality methods
d. inspect quality into the product
e. make quality a higher priority than cost or schedule
ans: c
2. communication management is best described as conducting or supervising
a. the way we listen
b. the way we speak
c. the way we feel考試大論壇
d. the exchange of information
e. perfect documentation activities
ans: d
3. good project objectives must be:
a. general rather than specific
b. established without considering resource bounds
c. realistic and attainable
d. overly complex
e. measurable, intangible and verifiable
ans: c
4. increasing resources on the critical path activities may not always shorten the length of the project because:
a. certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).
b. safety, osha and epa may have placed restrictions on the number of people used on certain activities or in the physical location of the
project.
c. the skill level of the added resources might not be appropriate for the activities to be performed.
d. adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)
e. all of the above.來源:考試大
ans: e
5. universal characteristics of effective project managers include such skills as communication, decision-making, planning, ability to identify
problems and:
a. performing feasibility studies
b. proposal preparation
c. being close to the customer
d. maturity
e. none of the above are universal characteristics
ans: e
6. which of the following is not a measure of the profitability of a project or program?
a. return on original investment.
b. net present value.
c. depreciation.
d. discounted cash flow.
e. none of the above
ans: c
7. _____ is a formal invitation containing a scope of work which seeks a formal response (proposal) describing both methodology and
compensation to form the basis of a contract.
a. request for proposal
b. invitation to bid
c. request for quotation
d. intention for bidwww.Examda.CoM
e. none of the above.
ans: a
8. by which means is a contractor able to control cost overruns due to changing requirements?
a. project data review
b. change order
c. purchase order amendment
d. change control
e. none of the above.
ans: d
9. douglas mcgregor's theory y advocates that the average worker:
a. dislikes work and avoids it whenever possible
b. must be closely supervised and even threatened with punishment
c. avoids increased responsibility
d. wants self-respect
e. none of the above
ans: d
10. feasibility studies occur in which life cycle phase (s)?
a. conceptual
b. conceptual or development來源:www.examda.com
c. execution
d. preliminary planning
e. any life cycle phase
ans: a
11. project managers must know:
a. what kind of message to send
b. to whom to send the message
c. how to translate the message into a language that everyone can understand
d. all of the above
e. a and b only
ans: d
12. quality attributes
a. are used to determine how effectively the organization accomplishes its goals
b. can be objective or subjective in nature
c. are specific quality characteristics for which a product is designed, built, and tested.
d. a and b.
e. b and c
ans: e
- 1項(xiàng)目費(fèi)用管理軟件系統(tǒng)都有哪些?哪些價(jià)格性能比較好呢?
- 2攪拌車電瓶照顧護(hù)士的幾點(diǎn)留意
- 3廣州某醫(yī)院群體建筑施工總平面圖
- 42015年一級(jí)建造師考點(diǎn)精髓《建筑專業(yè)》(12)
- 5數(shù)字化模板支撐體系施工工藝及方法
- 6不等不靠想辦法 搶前抓早保開工---牡綏鐵路工程Ⅱ標(biāo)段拉開復(fù)工序幕
- 7水泥土樁墻保護(hù)基坑的深度不大于6m
- 8中鐵十五局二公司石長項(xiàng)目賀家灣隧道1號(hào)暗洞順利完成二襯施工
- 9國務(wù)院部署“中國制造2025”
- 10關(guān)于甲方信息系統(tǒng)項(xiàng)目的整體管理
- 11PMP美國項(xiàng)目管理考試練習(xí)題及答案(八)
- 12《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》知識(shí)點(diǎn):新型工業(yè)化的特征
- 132015安全工程師《生產(chǎn)技術(shù)》:金屬材料高溫機(jī)械性能
- 14衡茶吉鐵路鋪軌到達(dá)井岡山境內(nèi)第一個(gè)車站-睦村車站
- 15“緊盯”400部施工電梯
- 16常見攪拌車病例分析及保養(yǎng)
- 17工程竣工備案工作 主要內(nèi)容
- 18筑爐工程施工安全的要求
- 192015招標(biāo)師考試教材《法規(guī)與政策》:第五章1
- 20盤江礦區(qū)煤礦井下人員定位系統(tǒng)設(shè)計(jì)初探
- 21上承式50m鋼筋混凝土拱橋施工工法
- 222015年招標(biāo)師《專業(yè)實(shí)務(wù)》輔導(dǎo):防范 “惡意取消”行為
- 23中國鐵建呂臨支線鐵路第二長隧?xiàng)罴規(guī)X1號(hào)隧道貫通
- 242015年招標(biāo)采購專業(yè)實(shí)務(wù)考點(diǎn):招標(biāo)投標(biāo)制度的發(fā)展歷程
- 252015安全工程師《相關(guān)法律知識(shí)》總結(jié):行政許可范圍和種類
- 262015年監(jiān)理工程師《建設(shè)工程三大控制》練習(xí)題(59)
- 27咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》練習(xí)習(xí)題(9)
- 282015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練10.30
- 29《現(xiàn)金咨詢方法與實(shí)務(wù)》知識(shí)點(diǎn):安裝工程費(fèi)的估算
- 302015年安全工程師輔導(dǎo):農(nóng)電安全生產(chǎn)管理
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓