PMP認(rèn)證考試練習(xí)題及參考答案(五)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. there are two major types of reserves used on projects. the _____ is for (usually major) scope changes that were not considered as part of
the original plan, whereas the _____ is to compensate for minor changes in estimating, escalation factors.
a. management reserve, unplanned allowance fund.
b. management reserve, contingency.
c. contingency fund, management reserve.
d. unplanned allowance fund, budgetary reserve.
e. unplanned reserve, planned reserve.
ans: c
2. to determine what causes the majority of quality problems in a process, a very useful tool is the:
a. cause and effect diagrams.
b. flow chart.
c. control chart.
d. pareto chart.
e. trend chart.來(lái)源:www.examda.com
ans: d
3. which of the following is not part of contract administration
a. contract award
b. performance control
c. financial control
d. contract closeout
e. all of the above are parts of contract administration.
ans: a
4. a(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight,
storage and loss.
a. inventory control.
b. materials management.
c. procurement.
d. all of the above.
e. a and c only.
ans: b
5. expectancy theory as applied to project management implies that:
a. the team will work the hardest on those goals that are clearly explained by the project manager
b. the more rewards that the project manager provides, the better the performance of the team
c. team members will work hardest for those project goals that also bring satisfaction to personal goals
d. employees will work hardest for those project goals which are accompanied by high levels of authority for the individual team members
e. none of the above
ans: c
6. non-verbal communication includes:
a. body movement
b. gestures來(lái)源:考試大網(wǎng)
c. facial expressions
d. the way we move our hands
e. all of the above
ans: e
7. the formal invitation to submit a price for specified goods/services is usually referred to as:
a. request for proposal
b. request for quotation
c. tender invitation
d. bid invitation
e. a and b only
ans: b
8. the project scope/charter baseline includes:
a. summary of background conditions defining the project.
b. organization, authority and responsibility relationships.
c. functions to be performed.
d. resource requirement schedule including time estimates.
e. all of the above.
ans: e
9. which of the following is not an input to quality planning?
a. scope statement.
b. regulations.
c. work results.
d. standards.
e. quality policy.
ans: c
10. which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previous
element has been completed?
a. pert
b. adm
c. pdm
d. all of the above.考試大(www.Examda。com)
e. a and c only.
ans: c
11. which of the following utility functions reflects risk-aversion:
a. uniform
b. increasing
c. decreasing
d. exponential
e. b and d only
ans: c
12. a deficiency in characteristics that render the quality of the material/service unacceptable is usually referred to as:
a. defective
b. defect
c. non-conformance來(lái)源:考試大網(wǎng)
d. poor workmanship
e. lack of fitness for use
ans: c
- 12015一級(jí)建造師《建設(shè)工程經(jīng)濟(jì)》知識(shí)點(diǎn)歸納(8)
- 2IPMP認(rèn)證:IPMP認(rèn)證考試
- 32015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(3.21)
- 4《現(xiàn)金咨詢方法與實(shí)務(wù)》知識(shí)點(diǎn):建設(shè)期利息估算的前提條件
- 5咨詢工程師2015年考試《項(xiàng)目組織與管理》練習(xí)題(8)
- 6咨詢工程師2015年考試《組織與管理》習(xí)題(1)
- 7二級(jí)建造師考試復(fù)習(xí)總結(jié):建筑幕墻工程分類
- 8四川省2008年度造價(jià)工程師執(zhí)業(yè)資格考試報(bào)名時(shí)間延長(zhǎng)至7月2日
- 9一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):次干路
- 10電子招標(biāo)投標(biāo)系統(tǒng)技術(shù)規(guī)范答疑:招標(biāo)文件管理應(yīng)具備哪些條件?
- 11招標(biāo)師法律法規(guī):采購(gòu)人的法律責(zé)任
- 122015安全工程師考試《相關(guān)法律知識(shí)》:安全生產(chǎn)許可證條例
- 13內(nèi)蒙古2008年度造價(jià)工程師執(zhí)業(yè)資格考試6月7日-9日補(bǔ)報(bào)名
- 14建筑工程投標(biāo)方案的編寫及注意問(wèn)題
- 15張家口公布2015安全工程師報(bào)名時(shí)間:6月23日至7月7日
- 162015年咨詢工程師《工程咨詢概論》考試講義3
- 17桐廬縣2015年安全工程師考試報(bào)名時(shí)間確定:4月8日至22日
- 18攪拌車熄火前切勿健忘關(guān)空調(diào)
- 192013年二級(jí)建造師《法規(guī)及相關(guān)知識(shí)》每日一練(2.8)
- 202015年造價(jià)工程師《理論與法規(guī)》專家講解(7)
- 212015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練(3.11)
- 22什么是條形基礎(chǔ)?
- 232015年咨詢工程師《工程項(xiàng)目組織與管理》每日一練12.8
- 24安全工程師考試《法律法規(guī)》習(xí)題班講義精選(66)
- 25安徽鳳陽(yáng)簡(jiǎn)陋辦公樓獲贊 被曝已建豪華新樓
- 262015造價(jià)工程師《理論與法規(guī)》教材講解(8)
- 272015一級(jí)建造師《市政工程》講義摘要(10)
- 282015年安全工程師考試《安全生產(chǎn)法及相關(guān)》練習(xí)題(32)
- 29蘭新鐵路第二雙線新疆首條高風(fēng)險(xiǎn)淺埋隧道線下工程全完工
- 302015年咨詢工程師《工程咨詢概論》每日一練4.15
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓