QUEST Risk mitigation involves all but which of the following:
A developing system standards (policies, procedure, responsibility standards)
B obtaining insurance against loss
C identification of project risks
D performing contingent planning
E developing planning alternatives
參考答案:C
QUEST The principles of risk management should be followed only for:
A complex projects
B simple projects
C large projects
D A and C
E All of the above.
參考答案:E
QUEST The type of contract (payment mechanism) chosen for a project is often a reflection of the degree of risk associated with completing that project. For a firm fixed price contract, payment for risk _____ .
A Is accomplished by paying the actual costs to the contractor.
B Is accomplished by paying the contractor for his costs plus a fixed fee (profit).
C Is an undisclosed contingency in the contractor's bid.
D Is accomplished by paying for the budgeted costs of dealing with risks, as predicted in the project risk assessment.
E B and C
參考答案:C
QUEST Risk can be divided into two basic types; business risk and pure (or insurable risk). Of the following, which one(s) fall(s) under business risk?
A liability loss
B direct property loss
C profit loss
D personnel-related loss
E B and C
參考答案:C
QUEST Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):
A should be deflected to the contracting officer
B should be handled via contingency allowances
C should be ignored, since they cannot be identified
D should be ignored, since they are not covered in the Project Risk Assessment
E C and D
參考答案:B
相關(guān)試題:
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案17
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
- 12015年監(jiān)理工程師考試《合同管理》習(xí)題(12)
- 22015年招標(biāo)師《專(zhuān)業(yè)實(shí)務(wù)》輔導(dǎo):整個(gè)招標(biāo)過(guò)程的時(shí)長(zhǎng)
- 3怎樣才能保證錨桿具有較高的初錨力?
- 4上海市某路隧道工程施工組織設(shè)計(jì)
- 52015年招標(biāo)采購(gòu)專(zhuān)業(yè)實(shí)務(wù)輔導(dǎo):招標(biāo)方案內(nèi)容3
- 6園林景觀設(shè)計(jì)的程序
- 72015年招標(biāo)師考試每日一練(8月25日)
- 82015年海南省造價(jià)工程師報(bào)考需提供的材料
- 92015安全工程師《生產(chǎn)管理知識(shí)》試題精選(20)
- 10EPS板薄摸灰外墻外保溫施工工藝
- 11CIO如何管理大型信息工程項(xiàng)目
- 12《政策與發(fā)展規(guī)劃》知識(shí)點(diǎn):中國(guó)農(nóng)業(yè)發(fā)展銀行
- 132015年長(zhǎng)沙安全工程師報(bào)名時(shí)間
- 142015年咨詢(xún)工程師《咨詢(xún)概論》答疑:框架合同
- 15二級(jí)建造師考試復(fù)習(xí)總結(jié):加固工程的類(lèi)型與功能
- 162015年咨詢(xún)工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練(3.29)
- 17西安至銅川建城際鐵路 投資58億全長(zhǎng)83公里
- 18山西:陵川中小學(xué)校舍危房改造全覆蓋
- 19美國(guó)項(xiàng)目管理PMP認(rèn)證模擬考試試題精選4
- 20一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):質(zhì)量和安全事故
- 212015造價(jià)工程師《理論與法規(guī)》課程講座(9)
- 22二建復(fù)習(xí)資料施工合同的法律特征
- 232015年咨詢(xún)工程師《工程咨詢(xún)概論》每日一練9.26
- 242015年監(jiān)理工程師《建設(shè)工程三大控制》考試試卷
- 25某工程水暖系統(tǒng)施工組織設(shè)計(jì) 64p
- 262015造價(jià)員《土建工程》造價(jià)基礎(chǔ)知識(shí):砌筑工程施工
- 27深基坑施工事故發(fā)生率高
- 28招標(biāo)采購(gòu)法律法規(guī)與政策大綱變動(dòng)及對(duì)比情況
- 29施工公司違紀(jì)界定 內(nèi)容
- 302015年海南省安全工程師報(bào)名時(shí)間為6月1日~6月30日
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓