當前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具
2010年P(guān)MP美國項目管理考試習題及答案六十四
QUEST The best way to insure quality conformance is to _____.
A distribute the responsibility to subordinates.
B maintain total control.
C train each worker to implement the work.
D inspect quality into the project.
E None of the above.
參考答案:C
QUEST In order to achieve long-term quality improvements, management must do the following:
A Motivate the employees with seminars, contests, and institute programs such as "Quality Improvement' day.
B Create a quality control department and give the head of the department ultimate responsibility for quality improvement.
C Implement of a formal quality control program with worker and management involvement.
D Establish financial incentive packages for worker.
E A and D
參考答案:C
QUEST The zero defects concept
A is a performance standard for management
B is a motivational technique that promotes "doing it right the first time".
C is used by management to communicate to all employees that everyone should do things right the first time.
D A and C.
E B and C
參考答案:D
QUEST An acceptance control chart has limits that are based on the spec. limits for the product rather than limits which differentiate between random and assignable causes. Under which of the following circumstances should a QC manager consider this type chart
A When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
B When the number of samples outside the current control chart limits become too costly and cumbersome to investigate.
C When a process is subject to constant but stable tool wear.
D A and B.
E A and C
參考答案:E
QUEST In the project environment, the individual ultimately responsible for quality control is:
A The line workers who must strive "to do things right the first time" to avoid quality problems.
B the company's quality control manager who must work with the project members to ensure the quality control program is effective.
C The head of the production department who retains ultimate quality control responsibility for all the company's projects.
D The project manager who has ultimate responsibility for the entire project.
E the customer who must ensure that he is receiving a quality product from the vendor.
參考答案:D
相關(guān)試題:
2010年P(guān)MP美國項目管理考試習題及答案六十三
試題推薦:
2010年P(guān)MP美國項目管理認定考試全真模擬試題精選1
2010年P(guān)MP美國項目管理認定考試全真模擬試題精選2
2010年P(guān)MP美國項目管理認定考試全真模擬試題精選3
- 12012年一級建造師《經(jīng)濟》:短期借款的利息支付方式
- 2某橋面面層改性瀝青混凝土施工
- 3西安市某住宅小區(qū)地下室防水施工方案
- 42015年咨詢工程師知識點:工程咨詢單位的風險
- 5綠化工程施工質(zhì)量控制措施
- 6項目決策的重要性
- 7江蘇省安全工程師資格考試信息管理通知
- 8攪拌車貼膜封釉封塑的注意事項
- 9安全工程師電工安全技術(shù)考核試卷(F卷)
- 10咨詢工程師考試《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》自測題(3)
- 112015年咨詢工程師《工程項目組織與管理》每日一練10.28
- 12一級建造師管理與實務(wù)復習要點:管道試壓
- 132013年二級建造師《施工管理》每日一練(2.16)
- 14煤礦井下預防冒頂?shù)拇胧?/a>
- 15【感謝名師】考試通過發(fā)感言 豐景春老師評價高
- 162015造價員《安裝工程》知識:審核工程必須做到的幾點
- 17預應(yīng)力混凝土連續(xù)梁、連續(xù)剛構(gòu)懸臂灌注施工
- 182015項目管理與招標采購考點:投融資服務(wù)項目進度管理
- 192015年安全工程師考試《安全生產(chǎn)管理知識》練習題(24)
- 20別讓這些招標概念混淆了你
- 212012一級建造師《公路工程》:公路工程施工組織的特點
- 222015年招標師考試答疑精選:投標保證金的收取比例是多少
- 232015年一級建造師考試輔導:項目管理規(guī)范(二十九)
- 24造價工程師復習資料:在住宅小區(qū)規(guī)劃設(shè)計中節(jié)約用地的主要措施
- 252015年招標師《法律法規(guī)》:發(fā)包與承包
- 26基坑降水有哪些作用?
- 272015年咨詢工程師《工程咨詢概論》每日一練(11.14)
- 28鋼筋混凝土斜塔斜拉橋的設(shè)計特點及施工技術(shù)
- 29創(chuàng)造國內(nèi)鋼箱梁頂推跨越高鐵施工新紀錄
- 302013年二級建造師《法規(guī)及相關(guān)知識》每日一練(11.16)
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓