QUEST Which of the following is considered a direct cost for producing a widget?
A The cost of the materials used to produce a widget.
B The labor costs of the workers who actually produced the widget.
C The rent for the building in which the widget was manufactured
D The salary of senior management and the project sponsor
E A and B only
參考答案:E
QUEST The reason that cost management is so difficult in project management is that:
A Projects by definition and nature are non-recurring events and are therefore difficult to predict.
B There are no tools for identifying project tasks.
C Project managers do not care about tracking costs, as only schedules are important to all project managers.
D A and B only
E B and C only
參考答案:A
QUEST Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:
A Baseline costs
B Budgeted costs.
C Estimates upon completion costs
D Scheduled costs
E None of the above
參考答案:A
QUEST The difference between the BCWS and the BCWP is referred to as the:
A Schedule variance
B Cost variance.
C Estimate of completion
D Actual cost of the work performed
E None of the above
參考答案:A
QUEST When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.
A Reduce features and/or functionality
B Increase risk.
C Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
D All of the above.
E A and B only
參考答案:D
相關(guān)試題:
2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案四十七
試題推薦:
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
- 1一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):混凝土總量
- 22015年造價(jià)工程師考試《理論與法規(guī)》知識(shí)精選(11)
- 3寫字樓消防安裝工程施工方案29P
- 4《項(xiàng)目管理與招標(biāo)采購》輔導(dǎo):工程計(jì)價(jià)依據(jù)和方法
- 5工程項(xiàng)目管理概述
- 6如何巧用春節(jié)假期備考2015年招標(biāo)師
- 72015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練3.14
- 8梅州市2015年安全工程師考試報(bào)名時(shí)間為4月13日至5月14日
- 9鋼筋混凝土預(yù)制沉井施工
- 10市政給水排水工程規(guī)劃設(shè)計(jì)與施工管理
- 11焦作市溫縣將建設(shè)無軌火車站 預(yù)計(jì)2016年完工
- 122015年安全工程師考試《安全生產(chǎn)技術(shù)》資料:模板工程
- 13屋面缸磚保護(hù)層分格空心橡膠條嵌縫施工工藝
- 142015年注冊(cè)咨詢工程師《項(xiàng)目決策分析》習(xí)題(11)
- 152015咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》沖刺試題3
- 16安全工程師安全生產(chǎn)法復(fù)習(xí)資料——工傷保險(xiǎn)申請(qǐng)時(shí)限、時(shí)效和責(zé)任
- 17給水泵房開挖施工方案7P
- 182015年造價(jià)工程師《理論與法規(guī)》專家輔導(dǎo)(21)
- 19安全工程師安全生產(chǎn)法復(fù)習(xí)資料——事故調(diào)查組的職責(zé)
- 202015造價(jià)員考試基礎(chǔ)知識(shí):竣工決算的編制
- 21安全工程師考試輔導(dǎo)資料:安全生產(chǎn)相關(guān)法律十六
- 22咨詢工程師《方法與實(shí)務(wù)》案例3:項(xiàng)目進(jìn)度管理
- 23每科以高出合格線20分通過,一級(jí)建造師考完后會(huì)再來向你們致謝
- 242015造價(jià)員復(fù)習(xí)資料:材料控制
- 252015年造價(jià)員基礎(chǔ)知識(shí):建筑安裝工程免費(fèi)項(xiàng)目管理系統(tǒng)費(fèi)費(fèi)率
- 262015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練(6.25)
- 27企業(yè)信息化項(xiàng)目集成風(fēng)險(xiǎn)預(yù)警指標(biāo)體系探討
- 28門窗知識(shí)大全
- 29聚合物混凝土特點(diǎn)
- 302015年招標(biāo)師考試《法律法規(guī)與政策》復(fù)習(xí)資料:第四章2
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓