QUEST Selection criteria for project selection include: 
A cost versus benefit 
B risk 
C contribution towards organizational goals 
D rate of return 
E All of the above. 
參考答案:E

QUEST The purpose of configuration management is to: 
A insure drawings are updated 
B control change throughout the project 
C control change during the production only 
D generate engineering change proposals 
E inform the project manager of changes 
參考答案:B

QUEST A work breakdown structure is most useful for: 
A identifying individual tasks for a project 
B scheduling the start of tasks 
C developing a cost estimate 
D determining potential delays 
E A and C 
參考答案:E

QUEST A Gantt chart is useful in determining: 
A the level of effort for a task 
B when a task starts and stops 
C how tasks are related to each other 
D who is assigned to do a task 
E All of the above. 
參考答案:B

QUEST A technical requirement has which of the following characteristics: 
A easy to understand 
B a communication tool between the user and the design team 
C written in non-technical language 
D developed in cooperation with the user 
E typically describe physical dimensions and performance requirements 
參考答案:E

相關(guān)試題:

2010年P(guān)MP美國項目管理考試習題及答案十一

試題推薦:

2010年P(guān)MP美國項目管理認定考試全真模擬試題精選1

2010年P(guān)MP美國項目管理認定考試全真模擬試題精選2

2010年P(guān)MP美國項目管理認定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:55    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項目管理工具其他應(yīng)用

項目管理工具 禪道項目管理軟件 夢龍項目管理軟件 微軟項目管理軟件 裝飾管理系統(tǒng) 裝修預算軟件 項目計劃軟件 項目進度管理軟件 軟件項目管理工具 材料管理軟件 工程項目管理軟件系統(tǒng) 項目管理系統(tǒng) 施工管理軟件 建筑工程項目管理軟件 工程管理軟件