Qustions 1:A change control system should include all the following except-
a. Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review
Qustions 3:
Two fundamental objectives of project control are to--
a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate
Qustions 5:
The project plan is important in change control because it--
a. Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project
Qustions 2:
Written changes orders should be required on --
a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified
Qustions 4:
The principal sources of project failure are-
a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control
Qustions 6:
Interface management is --
a. Considered to be one of the easier aspects of implementing the project plan
b. Primarily concerned with the technical issues associated with linking system components in a configuration
c. Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d. The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget
- 1[上海]高層住宅樓精裝修施工亮點(diǎn)做法及存在不足分析(70余頁)
- 22015年造價(jià)工程師考試《理論與法規(guī)》知識(shí)精選(13)
- 3建設(shè)工程合理管理自測題(一)
- 4濟(jì)南二環(huán)東路高架橋某合同段高架橋跨越城市道路鋼管貝雷梁應(yīng)用施工工法
- 5[江蘇]高速公路工程高填方路堤專項(xiàng)施工方案
- 6隧道斜井施工組織設(shè)計(jì)
- 7[四川]07安全工程師考試4.20-5.31報(bào)名
- 8四川啟動(dòng)新一輪水電站建設(shè) 五年投資或超萬億
- 9項(xiàng)目采購策劃的依據(jù) 內(nèi)容
- 102015年注冊(cè)監(jiān)理工程師《合同管理》模擬題(十二)
- 11三元乙丙橡膠高分子卷材施工工藝(實(shí)例)
- 12關(guān)于建設(shè)工程組織管理基本模式的說法,正確的有哪些
- 132015招標(biāo)師《招標(biāo)采購案例分析》串講資料下載(4)
- 14招標(biāo)師考試復(fù)習(xí)資料:政府采購有關(guān)要求(3)
- 152012一級(jí)建造師《公路工程》:公路工程施工安全管理的原則(3)
- 16二建施工管理重難點(diǎn):施工承包合同的主要內(nèi)容
- 17一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):泥漿護(hù)壁
- 182015年安全工程師《生產(chǎn)技術(shù)》習(xí)題精選(14)
- 19[貴州]公路造價(jià)管理研討會(huì)主要內(nèi)容
- 20某凈水廠設(shè)備安裝工程施工組織設(shè)計(jì) 37p
- 212015招標(biāo)師法規(guī)與政策考前知識(shí)點(diǎn):評(píng)標(biāo)專家的條件
- 22工程項(xiàng)目管理——強(qiáng)化施工現(xiàn)場管理促進(jìn)文明施工的思考
- 23填方路基及換填土施工
- 24安全工程師相關(guān)法律知識(shí)復(fù)習(xí)要點(diǎn):“三定”方案
- 25城市道路環(huán)境與資源調(diào)查的內(nèi)容
- 26雨季水泥攪拌車保養(yǎng)維修常識(shí)
- 272015年注冊(cè)咨詢工程師《工程咨詢概論》模擬試題(60)
- 282015年一級(jí)建造師《機(jī)電工程》電氣工程安裝技術(shù)(4)
- 29汽頂?shù)寡b法施工工藝在雙管鋼煙囪的運(yùn)用
- 30園林綠化工程施工組織設(shè)計(jì)47p
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓