當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
項(xiàng)目管理:PMP模擬題精選4
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
Qustions 1:As applied to projects, temporary means that--
a. Projects are short in duration
b. Every project has a definite beginning and end
c. The undertaking will end at an undetermined time in the future
d. Projects can be canceled at any time
Qustions 3:
Which of the following is an example a constraint in project plan development--
a. Records fo past performance
b. Financial reports from similar projects
c. A predefined budget
d. Lessons learned from prior projects
Qustions 5:
The management-by-objectives technique addresses all the following except--
a. Establishing unambiguous and realistic objectives
b. Periodically evaluating whether project objectives have been achieved
c. Promoting participation, team building, and commitment to the project
d. Establishing a specific career path for a project team member
Qustions 2:
All the following are examples of tools and techniques used in integration management except--
a. The work authorization system
b. Organizational procedures
c. Product skills and knowledge
d. Organizational policies
Qustions 4:
Performance measurement techniques are useful in overall change control because they --
a. Help show the status of the project
b. Measure overall project progress
c. Summarize information on the project for reporting to stakeholders
d. Help assess whether variances from the plan require corrective action
Qustions 6:
A work authorization system is a --
a. Work breakdown structure showing individual work elements
b. Formal procedure for sanctioning work so that it is done at the right time in the proper sequence
c. Method to ensure that each person on the project team knows the work elements that are his or her responsibility
d. System to help measure performance in terms of work completed versus work planned
- 12015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練(12.1)
- 2招標(biāo)采購專業(yè)實(shí)務(wù)復(fù)習(xí)心得順口溜
- 3居住區(qū)種植設(shè)計(jì)總平面圖
- 42015年咨詢工程師《政策與規(guī)劃》每日一練(3.16)
- 5某工程深基坑防水噴錨網(wǎng)支護(hù)技術(shù)探討
- 6湖北某高速公路隧道施工組織設(shè)計(jì)
- 72015年監(jiān)理工程師《建設(shè)工程三大控制》練習(xí)題(54)
- 8工程造價(jià)基礎(chǔ)知識(shí):工程財(cái)務(wù)
- 9深基坑支護(hù)施工中常見的問題
- 102015年安全工程師考試《事故案例分析》試題(11)
- 11增量來自產(chǎn)品創(chuàng)新,應(yīng)用技術(shù)有待優(yōu)化——再談自粘卷材給防水施工帶來的巨大變革
- 12招標(biāo)師復(fù)習(xí)資料:建設(shè)系統(tǒng)招標(biāo)要求(2)
- 132015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(8.21)
- 14京滬高速鐵路某標(biāo)段某隧道工程(實(shí)施)施工組織設(shè)計(jì)
- 152015年咨詢工程師每日一練免費(fèi)在線測試(2015.1.4)
- 16打樁順序如何確定,順序安排不合理對(duì)工程質(zhì)量有什么影響
- 172015年注冊(cè)咨詢工程師工程項(xiàng)目組織與管理習(xí)題(8)
- 18濰坊市2015年安全工程師考試報(bào)名時(shí)間擬定于5月20日至6月15日
- 19pmp項(xiàng)目管理:質(zhì)量管理練習(xí)題1
- 20靜態(tài)GPS在工程測量中的應(yīng)用體會(huì)
- 21一級(jí)建造師考試《機(jī)電工程》七大典型題型
- 222015年安全工程師考試《安全生產(chǎn)法》輔導(dǎo)資料(5)
- 23某高層大廈消防工程施工組織設(shè)計(jì)41P
- 24蘇州某廠房及配套設(shè)施施工平面布置圖匯編
- 25咨詢工程師《方法與實(shí)務(wù)》案例3:招標(biāo)與投標(biāo)
- 26范圍管理不佳引致項(xiàng)目陷入困境
- 27工作索賠按照自由時(shí)差還是總時(shí)差?
- 28軟土地基雙液注漿工法
- 29防水層倒置施工需注意的幾點(diǎn)
- 30咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》自測題(22)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓