2005年上半年信息項(xiàng)目管理師試卷5
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
● ___(66)___ is a method of constructing a project schedule network diagram that uses boxes or rectangles,referred to as nodes,to represent activites and connects them with arrows that asow the dependencies.This method includes following types of dependcies orprecedence relationships:
___(67)___the initiation of the successor activity, depends upon the completion of the predecessor activity.
___(68)___the initiation of the successor activity, depends upon the initiation of the predecessor activity.
(66) A.PDM B.CPM C.PERT D.AOA
(67) A.F-S B.F-F C.S-F D.S-S
(68) A.F-S B.F-F C.S-F D.S-S
● estimating schedule activity costs involves developing an ___(69)___ of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives.for example,in mostapplication areas,additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of ___(70)___ to facilitate comparisons both within and across projects. the ___(71)___ describes important information about prject requirement that is considered duing cost estimating.
(69) A.a(chǎn)ccuracy B.a(chǎn)pproxination C.specification D.summary
(70) A.a(chǎn)ctivity B.work C.currency D.time
(71) A.project scope statement B.statement of work
C.project management plan D.project policy
● The ___(72)___ technique involves using project characteristics in a mathematical model to predict total project cost.models can be simple or complex.
(72) A.cost aggregation B.reserve analysis
C.parametric estimating D.funding limit reconciliarion
● ___(73)___ is ameasurable, verifiable work poduct such as specification.feasibility study report, detail document, or working prototype
(73) A.milestone B.deliverable C.etc D.BAC
● ___(74)___ are individuals and organizations that are actively involved in the project, or whose interests may be affected as aresult of project execution or project completion; they may also exert influence over the project and its results.
(74) A.controls B.baselines
C.project stakeholders D.project managers
● ___(75)___ is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
(75) A.project acceptance B.scope verification
C.scope definition D.WBS Creation
- 1一級(jí)建造師復(fù)習(xí)資料:建設(shè)準(zhǔn)備
- 22009年二級(jí)建造師《法規(guī)及相關(guān)知識(shí)》習(xí)題四十
- 3淺談煙囪簡(jiǎn)體電動(dòng)升模施工專項(xiàng)安全技術(shù)措施
- 4京津冀首條城際鐵路年內(nèi)開(kāi)工:1小時(shí)交通圈
- 5首座高速公路雙層高架特大橋在隴南武都建成
- 6西成客專阜川隧道出口安全開(kāi)挖突破300米
- 7上海2015年的招標(biāo)師報(bào)名時(shí)間確定了嗎
- 8定向降準(zhǔn)精準(zhǔn)滴灌術(shù)跑偏:中小企業(yè)仍一貸難求
- 92013年一級(jí)建造師《建筑工程》考前測(cè)試題3
- 102015造價(jià)員考試須注意的細(xì)節(jié)問(wèn)題
- 11路基路面現(xiàn)場(chǎng)檢測(cè)方法詳解187頁(yè)(PPT)
- 12現(xiàn)有建筑物安全度的模糊綜合評(píng)定
- 13一級(jí)注冊(cè)消防工程師技術(shù)綜合試題:施工過(guò)程質(zhì)量控制要求
- 14水泥穩(wěn)定碎石基層施工指導(dǎo)
- 15合肥市今年實(shí)施7000戶農(nóng)村危房改造
- 16淺析清水混凝土處理的四個(gè)控制環(huán)節(jié)
- 17黃土隧道錨桿支護(hù)研究報(bào)告56頁(yè)(PPT 著名教授)
- 18上海某建筑工程檢測(cè)與試驗(yàn)方案
- 19共同承包的資質(zhì)要求有哪些
- 20項(xiàng)目管理之項(xiàng)目管理中應(yīng)注意的重點(diǎn)
- 21安全工程師《管理知識(shí)》復(fù)習(xí)資料:按評(píng)價(jià)結(jié)果的量化程度分類
- 22廣西規(guī)范污泥處理標(biāo)準(zhǔn) 禁止利用未達(dá)標(biāo)污泥
- 23河畔工程施工組織設(shè)計(jì)
- 24咨詢工程師考試《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》考點(diǎn)解析(二)
- 25國(guó)家注冊(cè)監(jiān)理工程師的考試資格
- 26地下室熱熔鋪貼卷材施工工藝
- 27BOT方式在土耳其的應(yīng)用
- 28某植物園改造工程施工方案98p
- 29中鐵二局貴安項(xiàng)目文明施工精細(xì)化管理受好評(píng)
- 30廣元全國(guó)安全工程師資格考試輔導(dǎo)班/廣元安全工程師資格考試培訓(xùn)班
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓