當(dāng)前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具
PMP認(rèn)證考試練習(xí)題及參考答案(十三)
1. of the following, who has the ultimate responsibility for meeting project quality objectives?
a. project engineer
b. project manager
c. functional manager
d. quality assurance manager
e. project owner
ans: bhttp://ks.examda.com
2. risk mitigation involves all but which of the following:
a. developing system standards (policies, procedure, responsibility standards)
b. obtaining insurance against loss
c. identification of project risks
d. performing contingent planning
e. developing planning alternatives
ans: c
3. the cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:
a. payment authorization
b. bid cost considerations
c. release payment
d. back charge
e. none of the above.
ans: d
4. the sequential steps that define the process for successfully completing a project is:
a. implementation plan
b. a life cycle
c. development plan
d. a critical path
e. management plan來源:考試大
ans: b
5. which of the following time robbers end up creating additional work for the project manager and the project office?
a. failure to delegate
b. changes without notification or direction
c. unreasonable time constraints
d. over directing people
e. all of the above
ans: e
6. you are giving your team instructions on how to perform a new test which is different from the way that the team had performed it previously.
the best way to verify that the learn understands what you want is to:
a. obtain feedback
b. analyze the team's perceptions barriers
c. uses gestures in presenting the instructions
d. analyze the team's decoding skills
e. analyze the team's encoding skills來源:www.examda.com
ans: a
7. a common way by which executives provide the project manager with written authority is through:
a. a common job description for all project managers
b. an appointment letter
c. a project charter
d. all of the above
e. b and c only
ans: e
8. surveys have shown that the primary skill needed to be a project manager is communication skill. the typical project manager spends
approximately ______percent of his or her time communicating.
a. 40-50
b. 50-60
c. 60-75
d. 75-90
e. 90-95
ans: d
9. the work breakdown structure (wbs) is the basis for communicating:
a. project scope, cost control, schedule, quality
b. project objectives, dependencies, plan, cost control
c. project scope, schedule, staffing, cost control
d. project scope, quality, schedule, dependencies
e. project budget, schedule, risk factors, work assignments.
ans: a
10. the quality objectives are approved in the conceptual stage of the project by the:
a. project engineer
b. project manager
c. functional manager來源:www.examda.com
d. quality assurance manager
e. project owner
ans: e
11. total project risk:
a. should not be calculated for small projects
b. is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the
project.
c. is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.
d. a and b
e. a and c
ans: c
12. _____ is a narrative description of the work to be accomplished or resource to be supplied.
a. purchase order
b. level of effort work
c. scope of work
d. contract stipulation
e. none of the above.
ans: c
- 1廣州將出臺歷史建筑修繕指引
- 2張家界投資19.62億擴(kuò)建荷花國際機(jī)場
- 3項目管理與招標(biāo)采購第二章:工程建設(shè)項目決策階段風(fēng)險管理
- 4[河北]剪力墻結(jié)構(gòu)住宅樓工程衛(wèi)生間防水工程施工方案
- 5某項目南北連接地下通道工程施工組織設(shè)計111P
- 6俄國家原子能集團(tuán)考慮建設(shè)哈爾濱核電站
- 72015招標(biāo)師考試應(yīng)試指導(dǎo)篇——考試心理
- 8工程項目組織與管理知識點:《招標(biāo)投標(biāo)法》的立法目的
- 9"金九銀十"亦未能改變樓市低迷 兇猛價格戰(zhàn)或?qū)砼R
- 10城市橋梁工程施工準(zhǔn)備的內(nèi)容
- 112015年廣東省安全工程師考試報名時間為4月26日-5月20日
- 12訪談:北京高陽金信信息技術(shù)公司首席技術(shù)官 林志國
- 132013年湖南二級建造師增項注冊申請表
- 142015年咨詢工程師《工程咨詢概論》每日一練4.16
- 15二級建造師考試復(fù)習(xí)總結(jié):SAC瀝青混凝土路面施工技術(shù)
- 16廣東水泥控排啟動 清遠(yuǎn)17家企業(yè)列入其中
- 17南京地鐵三號線江北段地下區(qū)間全部貫通
- 18混泥土輸送泵功率分類與選型
- 19混凝土空心小型砌塊的品種及性能是什么
- 20一級建造師工程經(jīng)濟(jì)復(fù)習(xí)要點:交通車輛費用
- 21古羅馬斗獸場修復(fù)工程第一階段正式完工
- 222015年注冊咨詢工程師《工程咨詢概論》模擬題(44)
- 232015年注冊安全工程師《相關(guān)法律知識》模擬試題(27)
- 24同一公司兩次購買招標(biāo)文件怎么辦?
- 25根據(jù)《建設(shè)工程施工合同(示范文本)》,下列工作中,應(yīng)由發(fā)包人完成的有
- 26四川某高瓦斯隧道剩余工程(無軌運輸)施工組織設(shè)計
- 272015年安全工程師考試《安全生產(chǎn)管理知識》練習(xí)題(37)
- 28多功能屋面工程施工技術(shù)
- 292013年二級建造師《施工管理》每日一練(3.12)
- 302015.9.26咨詢工程師每日一練免費在線測試
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓