1. communications is best described as:
a. an exchange of information.
b. providing written or oral directions.
c. consists of senders and receivers
d. effective listening.
e. all of the above考試大論壇
ans: e
2. fixed price contracts place more risk on the:
a. owner
b. buyer
c. seller
d. contractor
e. c or d
ans: e考試大(www.Examda。com)
3. life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. life cycle costing categories include the cost
of _____, _____, and _____.
a. r & d, maintainability, operation and support.
b. r & d, production, operation and support.來源:考試大
c. acquisition, operations, maintenance.
d. production, operations, maintenance.
e. none of the above
ans: b
4. management by objectives assumes that the team:
a. is receptive to an unstructured environment.
b. does not require close supervision.
c. possesses a self directed philosophy
d. identifies with project objectives.來源:考試大
e. all of the above.
ans: e
5. quality may be defined as:
a. conformance to requirements.
b. fitness for use.
c. continuous improvement of products and services
d. appeal to the customer
e. all of the above except b來源:考試大
ans: e
6. since risk is associated with most projects, the best course of action is to:
a. cover all project risks by buying appropriate insurance
b. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.
c. avoid projects with clear and present risks
d. eliminate all known risks prior to the execution phase of the project
e. identify various risks and implement actions to mitigate their potential impact
ans: e
7. the process of choosing/documenting the best approach to achieve the project objectives is part of:
a. the scope baseline.
b. scope authorization來源:考試大網(wǎng)
c. scope definition
d. scope planning.
e. all of the above.
ans: d
8. time management is the allocation of time in a project's life cycle through the process of:
a. planning
b. estimating.
c. scheduling.
d. controlling
e. all of the above.
ans: e
9. a comprehensive definition of scope management would be:
a. managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.
b. approval of the scope baseline.http://ks.examda.com
c. approval of the detailed project charter.
d. configuration control.
e. approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.
ans: a
10. cost plus percentage of cost contracts are more desirable for the:
a. owner
b. buyer
c. seller
d. contractor
e. c or d
ans: e
11. management styles associated with production environments, such as assembly lines commonly include:
a. a directing style of leadership.
b. a lack of confidence in their workerswww.Examda.CoM
c. assumption that workers lack ambition and dislike responsibility
d. a theory x style of leadership
e. all of the above.
ans: e
12. quality management:
a. is another name for careful inspections.
b. is inversely related to productivity.
c. is primarily the responsiblity of management.
d. is primarily the responsibility of the workers.
e. is essentially a motivational technique.
ans: c
- 12015年咨詢工程師知識點(diǎn):市場戰(zhàn)略的評估和預(yù)測
- 2EDSA-北京橡樹灣完整施工圖(含水電植物)
- 32015年監(jiān)理工程師考試質(zhì)量、投資、進(jìn)度控制練習(xí)題(44)
- 4攪拌車輪轂日常保養(yǎng)需要注意的事項(xiàng)
- 52015年一級建造師《公路工程》橋梁工程施工(6)
- 6鎮(zhèn)江人事考試考工網(wǎng)公布2015年安全工程師資格考試報(bào)名通知
- 7安全工程師:安全生產(chǎn)技術(shù)單項(xiàng)選擇試題
- 8咨詢工程師《工程咨詢概論》練習(xí)題25
- 9四川雅瀘高速公路某合同段隧道(實(shí)施)施工組織設(shè)計(jì)
- 102015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(5.5)
- 11安全工程師輔導(dǎo)資料:推行“一法三卡”工作中如何做好危險(xiǎn)源點(diǎn)分析2
- 12園林綠化工程質(zhì)量監(jiān)督管理
- 13高壓噴射注漿法的類型有哪些?
- 14圓管涵施工方法
- 152015年招標(biāo)師考試《管理與采購》復(fù)習(xí)材料(3)
- 162013年二級建造師《施工管理》每日一練(12.23)
- 17某高層大廈消防工程施工組織設(shè)計(jì)41P
- 18小區(qū)規(guī)劃詳細(xì)施工圖
- 19經(jīng)濟(jì)政策與法規(guī)考試點(diǎn):產(chǎn)業(yè)調(diào)整對策措施
- 202015年監(jiān)理工程師《基本理論與相關(guān)法規(guī)》模擬題(1)
- 21現(xiàn)代咨詢方法與實(shí)務(wù)考點(diǎn):成本與費(fèi)用估算要求
- 222015年咨詢工程師《工程咨詢概論》考試講義4
- 23《現(xiàn)金咨詢方法與實(shí)務(wù)》知識點(diǎn):邏輯框架法的概念
- 242015年注冊咨詢工程師《工程咨詢概論》模擬題(51)
- 252015年招標(biāo)師法律法規(guī)政策考試練習(xí)題(9)
- 26玻璃生產(chǎn)線煙氣SCR脫硝工程項(xiàng)目優(yōu)勢顯著
- 27項(xiàng)目決策分析與評價(jià)知識點(diǎn):項(xiàng)目選址應(yīng)考慮的因素
- 28腳手架搭設(shè)施工安全技術(shù)措施
- 29施工措施通用項(xiàng)目及施工措施市政工程專用項(xiàng)目
- 302015年一級建造師《公路工程》交通工程施工(1)
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓