1 The person sending a message is NOT influenced by which of the following
A sender's credibility
B receiver's assumptions
C receiver's evaluative and tendency
D receiver's attitude and needs
E sender's knowledge
ans:C
2 Achieving effective upward communications in an organization requires that the sender consider which of the following:
A entropy
B position
C the medium
D A and B.
E All of the above.
ans:E
3 Five people are involved on a project that requires significant communication between all project participants. How many lines of communication exist on this project?
A 5
B 6
C 8
D 10
E 9
ans:D
4 All the techniques described below can be used to keep a meeting focused except:
A Recall agenda items/purpose of meeting
B Summarize discussion periodically
C Encourage pursuit of interesting new ideas www.Examda.CoM
D Rephrase unclear ideas presented by group members
E All are acceptable techniques
ans:C
5 All of the following statements define the role of a meeting chairperson except:
A Initiates and concludes discussion
B Controls irrelevant discussion
C Resolves strong disagreements
D Produces meeting agenda
E Consolidates agreements.
ans:D
6 The accounting head asks an assistant to cut the payroll checks today. The head later arrives to sign the checks, only to find that the assistant shredded (cut) the blank check forms. Which phrase best describes this lack of communication.
A Bypass instruction
B Faulty perception of reality
C Bad attitude of listener 來(lái)源:考試大
D Lazy listening
E Emotionalism
ans:A
7 You have assembled your thoughts into a message. As you pass this information to a second party, you are giving this person your:
A Input
B Output
C Data
D Feedback
E A and C
ans:B
8 The process of interpreting a message is:
A Decoding
B Receiving
C Encoding
D Feedback
E A and C
ans:A
9 A project manager wants to transmit a complex message to several subordinates. What is the best medium by which the manager can get his message across?
A Oral
B Written
C Nonverbal
D A and B only
E A, B, and C.
ans:E
10 Your client, with which you have good relations, wants you to provide him with office supplies. This task is not supported under your contract. You respond to your client's informal request using which medium?
A Speech
B Written
C Oral
D A and C
E Form letter
ans:C
11 As project manager, you wish to impose a standard method by which subordinates calculate project costs. Which level of communication should be required for this effort?
A Face-to-face
B Telephone
C Written
D Non-verbal
E All of the above should be required.
ans:C
12 You are in a meeting with someone who just ate a slice of garlic bread. Your are distracted by his pungent breath. Which of the following communication barriers describe these distractions?
A Sign Detection
B Sensory Limitations
C Selective Perception 來(lái)源:www.examda.com
D Varying Alertness of Perception
E None of the above
ans:A
- 12015年安全工程師《生產(chǎn)管理知識(shí)》試題精選(11)
- 2安全工程師考試《法律法規(guī)》習(xí)題班講義精選(16)
- 32015年招標(biāo)師法律法規(guī)高頻考點(diǎn):招標(biāo)代理機(jī)構(gòu)性質(zhì)
- 4招標(biāo)師考試復(fù)習(xí)資料:交通系統(tǒng)招標(biāo)要求(3)
- 5昆明鐵路局2013年投資217億元建鐵路
- 6[天津市]05造價(jià)工程師考試報(bào)名時(shí)間為6月1—3日
- 72015年安全工程師相關(guān)法規(guī)模擬練習(xí)匯總
- 8天然草坪施工方案
- 9沉管灌注樁施工安全要求
- 10河北保定10月1日起強(qiáng)制執(zhí)行建筑節(jié)能75%標(biāo)準(zhǔn)
- 11由建設(shè)工程投資、進(jìn)度、質(zhì)量三大目標(biāo)之間存在對(duì)立關(guān)系可知,建設(shè)工程三大目標(biāo)應(yīng)
- 122013年二級(jí)建造師《施工管理》知識(shí)點(diǎn)整理:施工成本分析
- 132015年招標(biāo)采購(gòu)專(zhuān)業(yè)實(shí)務(wù)輔導(dǎo):資格審查的原則和方法
- 14咨詢(xún)工程師2015《經(jīng)濟(jì)政策》精選習(xí)題(14)
- 152015招標(biāo)師《項(xiàng)目管理與招標(biāo)采購(gòu)》:交易前的準(zhǔn)備階段
- 16高速鐵路板式無(wú)砟軌道CA砂漿灌注工法
- 17[濰坊市]06年安全工程師考試報(bào)名通知
- 18一級(jí)建造師《工程經(jīng)濟(jì)》知識(shí)點(diǎn)整理(14)
- 19咨詢(xún)工程師2015《經(jīng)濟(jì)政策》精選習(xí)題(11)
- 20經(jīng)濟(jì)政策與發(fā)展規(guī)劃考點(diǎn):投資主體
- 21合肥地鐵1號(hào)線最南“一截”動(dòng)工
- 22《工程項(xiàng)目組織與管理》知識(shí)點(diǎn):工作定義的方法
- 232015年安全工程師《事故案例分析》模擬題(16)
- 24安全工程師《安全生產(chǎn)管理》第三講講義精選(6)
- 25信息技術(shù)在建筑施工管理中的應(yīng)用
- 26三合一自粘防水卷材的施工工藝
- 27造價(jià)工程師建設(shè)工程造價(jià)管理復(fù)習(xí)資料——償債能力指標(biāo)
- 28建筑工程現(xiàn)場(chǎng)施工經(jīng)驗(yàn)——事故處理經(jīng)驗(yàn)供大家學(xué)習(xí)參考(55)
- 29湖南第一高樓12天長(zhǎng)高一層 墻體是普通樓房4倍
- 30瀝青混凝土面層施工質(zhì)量控制要求
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓