QUEST An element in the WBS was estimated to require 1 month for completion with 1000 hours of labor and a burdened cost of $50K. The task was completed in 1000 hours but a burdened cost of $60K. The most likely reason for the increase would be:
A Higher salaried employees were assigned.
B Overtime was required.
C The overhead rate increased.
D Employee salaries had increased.
E Any of the above
參考答案:E
QUEST During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:
A The project will be completed late.
B The critical path has been lengthened.
C the costs are being overrun.
D Overtime will be required to maintain the original critical path.
E None of the above.
參考答案:E
QUEST Using the situation stated in the Special window, the total price variance of direct material is:
A ¥80,245
B ¥-4,236
C ¥-3,479
D ¥1
E ¥83,994.00
參考答案:C
QUEST Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.
A Become worse, become worse
B Become worse, improved
C Improved, increased
D Improved, become worse
E None of the above are correct
參考答案:E
QUEST A graphical display of accumulated costs and labor hours for both budgeted and actual costs, plotted against time, is called a(n) _____.
A Trend line.
B Trend analysis.
C S curve.
D Percent completion report.
E Earned value report.
參考答案:C
相關(guān)試題:
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案五十一
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
- 12015年咨詢工程師知識(shí)點(diǎn):目標(biāo)評(píng)價(jià)的層次
- 2建筑工程施工組織設(shè)計(jì)常用資料
- 3深基坑施工排水機(jī)具的選用
- 4一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):孔道壓漿
- 5地基設(shè)計(jì)有哪些原則?
- 6成昆鐵路米易至攀枝花段線路走向確定
- 7聽課過程中遇到的報(bào)錯(cuò)問題
- 8景觀大道施工組織設(shè)計(jì)104p
- 9決策分析與評(píng)價(jià)考點(diǎn):風(fēng)險(xiǎn)評(píng)估
- 102015年招標(biāo)師考試招標(biāo)采購(gòu)案例分析復(fù)習(xí)指導(dǎo)(23)
- 11項(xiàng)目管理與招標(biāo)采購(gòu)第四章:工程咨詢服務(wù)項(xiàng)目的范圍
- 12蘭渝鐵路某標(biāo)某隧道(實(shí)施)施工組織設(shè)計(jì)
- 13注冊(cè)咨詢工程師《工程咨詢概論》預(yù)測(cè)試題(1)
- 14冬季混凝土攪拌車保養(yǎng)維修中不要犯的幾個(gè)錯(cuò)誤
- 15一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):回轉(zhuǎn)鉆
- 16一級(jí)建造師工程經(jīng)濟(jì)復(fù)習(xí)要點(diǎn):所得稅率的計(jì)算
- 17施工企業(yè)工程項(xiàng)目的信息化管理
- 18滬昆高鐵湖南段重點(diǎn)控制工程隧道貫通
- 19安全工程師答疑精華:先導(dǎo)式
- 20水利水電工程就業(yè)方向
- 21編制投標(biāo)書常見的115個(gè)錯(cuò)誤(十五)
- 22安全工程師法規(guī)復(fù)習(xí)要點(diǎn):四不放過”原則
- 232015年安全工程師考試題庫(kù)《生產(chǎn)技術(shù)》(7)
- 24湖南機(jī)械教您如何操作混凝土輸送泵
- 252015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(12.8)
- 26國(guó)家發(fā)改委關(guān)于注冊(cè)安全工程師收費(fèi)標(biāo)準(zhǔn)的通知(考試介紹)
- 27帶壓密封施工過程中的安全性問題
- 28土方量批量計(jì)算方法探討
- 29耽誤混凝土攪拌車壽命本領(lǐng)
- 302015年呼倫貝爾造價(jià)工程師現(xiàn)場(chǎng)審核地點(diǎn)及時(shí)間
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓